Similar Projects
Replace Ice Bank Controls - Stocking Hall East
Renovation
Conception
Ithaca, NY 14853

Replace Fire Alarms - Kennedy Hall & Roberts Hall
Renovation
Conception
Ithaca, NY 14850

Baker Lab Roof Replacement
Renovation
Post-Bid
$200,000 to $230,000 est. value
Ithaca, NY 14882

Uris Hall Elevator Modernization
Renovation - 1,380 SF
Post-Bid
$1,700,000 to $1,750,000 est. value
Ithaca, NY 14853

Construction Manager Term Agreement - North Region
Term Contract
Results

Construction Manager Term Agreement - South Region
Term Contract
Results

Bradfield Hall Rehabilitation / System Upgrades
Renovation
Construction
$12,815,000 est. value
Ithaca, NY 14853

Bard Hall Code Improvements
Renovation
Construction
$4,500,000 est. value
Ithaca, NY 14853

Replacement of HVAC systems in Stocking Hall East at Cornell University - Consultant Services
Renovation - 7,000 SF
Post-Bid
Ithaca, NY 14853

Snee Hall Renovation For Colocation Of EAS
Renovation - 10,225 SF
Construction
$938,700 est. value
Ithaca, NY 14850

Cornell Multidisciplinary Building
New Construction - 104,000 SF
Post-Bid
$4,800,000 to $5,000,000 est. value
Ithaca, NY

Africana Studies And Research Center Fire Escape Repairs
Renovation - 88 SF
Construction
$49,600 est. value
Ithaca, NY 14850

Abate & Replace Floor Tile - Rice Hall & Plant Virology
Renovation, Alteration - 2,610 SF
Post-Bid
$170,000 to $190,000 est. value
Ithaca, NY 14850

Kennedy Hall Landscape Architecture Maker Space Renovation
Renovation - 586 SF
Construction
$255,980 est. value
Ithaca, NY 14850

Mann Library Addition Emergency Generator Replacement and Sprinkler System Modification
Renovation
Post-Bid
$1,000,000 to $1,250,000 est. value
Ithaca, NY 14850

Reported 06/02/2022 04:04 PM
Project Title

Student & Campus Life Code Remediation Phase 3A

Physical Address View project details and contacts
City, State (County) Ithaca, NY 14850   (Tompkins County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method
Project Status Permitting, Construction Start Expected June 2022, Construction Completion Expected August 2022, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $328,100
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Test existing paint for lead on railing systems. Abate lead contained paint. 2. Test existing metals to be modified to determine metal compositions for welding. 3. Existing guardrail modifications shall include work in interior stairwells. 4. Remove, extend, and re-install existing hand/guardrails at one half flight exterior stair. 5. Prepare, prime, and paint all affected railings and posts to match existing colors and sheens.Total sq ft for project not available at this time.

Details

College/University, Renovation.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents