Similar Projects
USACE SPK DBB Construction - Lower American River, Site 2-1
Renovation, Term Contract
Design
$25,000,000 to $100,000,000 est. value
Sacramento, CA 95825

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

Millbrae and Burlingame Shoreline Area Protection and Enhancement
Infrastructure
Bidding
Millbrae, CA 94030

SJC General Aviation Run Up Pad Relocation
Term Contract, Alteration
Bidding
$1,386,000 est. value
San Jose, CA

Citywide Flood Protection Maintenance
Infrastructure
Post-Bid
Paso Robles, CA

American River Common Features 2016 Erosion Protection Project
Term Contract
Post-Bid
Sacramento, CA 95814

Z--Canal Construction, Repair And Replacement Indefinite Delivery / Indefinite Qua
Results

Z--Canal Construction, Repair And Replacement Indefinite Delivery / Indefinite Qua
Results

Riverside Levees Pl 84-99 Rehabilitation Project
Renovation, Infrastructure
Design
$25,000,000 to $100,000,000 est. value
Riverside, CA

Industry Day - American River Common Features 2016, Sacramento River East Levee (SREL), Contract 4
Alteration
Bidding
Sacramento, CA

CA FTNP REDW 100(1) Cushing Creek Box Culvert
Infrastructure
Post-Bid
$600,000 to $900,000 est. value
Crescent City, CA 95531

Compost Leachate Pond Improvements
Renovation
Results
$1,900,000 est. value
Auburn, CA 95603

Culvert Contact Grouting, Concrete Invert Paving and Misc. Iron and Steel
Infrastructure
Bidding
$770,000 est. value
CA

Hannah Ranch Check Structure
Infrastructure
Post-Bid
Farmersville, CA

County Roadway Drainage Improvement Project
Infrastructure
Results
CA

Reported 02/16/2022 12:00 AM
Project Title

Wall Installation and New Levee Construction

Physical Address View project details and contacts
City, State (County) Wheatland, CA 95692   (Yuba County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $4,400,000 to $4,900,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists mainly of cutoff wall installation and new levee construction (2800 lf), degrade of an existing levee embankment (2500 lf), vegetation removal, well abandonment, seepage berm construction (100 lf), and levee buttress construction (7500 lf).

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents