Similar Projects
Last Updated | 09/14/2022 02:33 PM |
Project Title | Cornell University HMF Enabling Project |
Physical Address | View project details and contacts |
City, State (County) | Ithaca, NY 14850 (Tompkins County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Bids by Invitation |
Project Status | Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,500,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | DESCRIPTION OF PROJECT 1. Fabricate and erect on-site an experimental "Hutch" & “Cave” for Beamline #5. The "Hutch" & “Cave”, will be enclosures that are comprised of a steel structural frame, clad in steel, lead, steel sandwich panels. This enclosure will be designed to protect people and objects outside the hutch from Alpha, Beta, and Gama radiation as well as Strong magnetic forces. Custom "Labyrinths" for utilities will need to be built into wall panels. This unit will be fabricated off site, test fit for assembly, and then disassembled and then reassembled within the newly constructed NEH building. The project will include custom sliding doors at the new hutch and cave, as well as (4) additional new doors at existing concrete walled caves. ESTIMATED CONSTRUCTION BUDGET: $1.4M-$1.5M Project Schedule: Start: Within fourteen (14) days of written authorization to proceed. Completion: April 20, 2024 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |