Similar Projects
Annual Contract for Natural Gas Construction
Term Contract
Bidding
Buford, GA

SR 11/Jefferson Highway at SR 211/Rockwell Church Road Natural Gas Relocation
Infrastructure
Bidding
$300,000 est. value
Winder, GA 30680

Industrial Air Park
Post-Bid
Bainbridge, GA

Water And Wastewater Treatment Chemicals
Post-Bid
Morrow, GA 30260

Propane Air Mix Plant Emergency Reserve
Results
Robins Afb, GA

Hershall B. Norred Water Treatment Plant Cal-Flo Liquid Lime System Installation
Results
Newnan, GA 30263

Natural Gas Main Extension Great Valley Commerce Center
Infrastructure
Bidding
$200,000 est. value
Cartersville, GA

Blanket Contract for Main Extensions - Natural Gas System
Term Contract, Infrastructure
Post-Bid
Covington, GA

Installation of New Gas Mains and Services
Term Contract
Results
Warner Robins, GA

Pittman Kiln Gas Line Extension 2022
Infrastructure
Bidding
$200,000 est. value
Moultrie, GA

On-Demand Installation of New Gas Mains on an Annual Contract
Term Contract
Post-Bid
Lawrenceville, GA

API 653 AST Internal Inspection and Tank Cleaning Robins AFB
Results
Warner Robins, GA

2022 Gas Collection and Control System (GCCS) Expansion at Seminole Road MSW Landfill
Term Contract
Post-Bid
GA

Thompson Mill Rd/Buford Hwy Natural Gas Relocation
Results
Buford, GA 30515

Fuel Tank Inspection - Robins Georgia
Alteration
Post-Bid
Warner Robins, GA

Last Updated 06/20/2022 12:10 AM
Project Title

Bostwick Natural Gas Main Extension

Physical Address View project details and contacts
City, State (County) Madison, GA 30650   (Morgan County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: Installation of approximately 17,700 linear feet of 4-inch HDPE gas main along Old Mill Road and extends through Hard Labor Creek State Park along Fairplay Road to Prospect Road. The installation will also include untrenched installations, line valves, connections, and related appurtenances. The project will also include an Additive Alternate for the installation of an additional 20,000 linear feet of 4-inch HDPE gas main along Fairplay Road, Sandy Creek Road, and Riden Road. The 4-inch HDPE gas main, valves, and fittings will be furnished by the City for installation by the Contractor.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents