Similar Projects
New Soo Lock, New Third Lock
New Construction
Bidding
$500,000,000 est. value
Sault Sainte Marie, MI 49783

Upstream Approach Wall Construction for the Soo Lock Complex, Sault Ste. Marie, MI.
Post-Bid
$100,000,000 to $250,000,000 est. value
Sault Sainte Marie, MI

Project Labor Agreement for Construction of New Soo Lock Chamber
Post-Bid
$500,000,000 est. value
Sault Sainte Marie, MI 49783

Korpela to Wakefield Stateline Grade Extension Culvert and Bridge Replacement
Results
MI

Union Street Dam Fish Pass
Results
Traverse City, MI 49684

Jd #150
Renovation, Demolition - 11,569 SF
Construction
$550,000 est. value
Flint, MI

High Temperature Hot Water Replacement to Hill House
Post-Bid
Rochester, MI 48316

2020 Chappel Dam Improvements
Results
Gladwin, MI 48624

Natural Science - Loading Dock Alterations
Post-Bid
East Lansing, MI

Milham Park Dam Removal
Results
Kalamazoo, MI

Poe Lock Rehibition Ship Arrestors Sault Ste Marie, MI
Renovation
Post-Bid
$10,000,000 to $25,000,000 est. value
Sault Sainte Marie, MI

Eden Dam Modifications and Stabilization Measures
Results
MI

Sea Lamprey Trap (East Branch) Au Gres River, MI
New Construction
Post-Bid
$500,000 to $1,000,000 est. value
Au Gres, MI

Perrin Dam Improvements
Results
Marshall, MI

3.5 Mg Water Reservoir
Results
Shelby Township, MI

Reported 10/16/2021 12:00 AM
Project Title

Multiple Tunnel Sections - South U Tunnel - Major Maintenance and Repair

Physical Address View project details and contacts
City, State (County) Ann Arbor, MI   (Washtenaw County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents