Similar Projects
Taxiway Relocation and T-hangar Taxilanes
Infrastructure
Bidding
$2,000,000 est. value
Centreville, AL 35042

Taxiway Rehabilitation at Mac Crenshaw Memorial Airport
Infrastructure
Bidding
$300,000 est. value
Greenville, AL 36037

Construction of Improvements to Jack Edwards National Airport
Post-Bid
Gulf Shores, AL 36542

Airport Access Road
Post-Bid
Florala, AL 36442

Reconstruct Runway 4-22 at the Tuscaloosa National Airport
Results
Tuscaloosa, AL 35401

Runway 18/36 and Taxiway A Pavement Maintenance
Results
Foley, AL 36535

Apron Reconstruction at Richard Arthur Field Airport
Infrastructure
Bidding
$40,000 est. value
Fayette, AL 35555

Taxiway Rehabilitation Project
Post-Bid
Talladega, AL

Remark Runway 12/30 at Jeremiah A. Denton Airport
Results
$39,820 est. value
Dauphin Island, AL 36528

Posey Field Airport Improvements
Infrastructure
Bidding
$2,100,000 est. value
Haleyville, AL 35565

Taxiway Reconstruction
Post-Bid
Albertville, AL

Runway Reconstruction
Results
Vinemont, AL 35179

Runway 18/36 and Taxiway A Pavement Maintenance
Infrastructure
Post-Bid
Foley, AL 36535

Improvements to the Dothan Regional Airport
Results
Midland City, AL 36350

Greensboro Municipal Airport - Overlay Runway 18/36
Infrastructure
Post-Bid
Greensboro, AL 36744

Last Updated 06/27/2022 07:59 AM
Project Title

Airfield Pavement Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Chatom, AL   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing of all supervision, technical personnel, labor, materials, machinery, tools, equipment, incidentals, and services, including utility and transportation services, and the performance and completion of all work required for the maintenance / rehabilitation of the existing runway, taxiway, and apron (approx. 43,250 sy). Work will consist of the following: (1) removal of rubber and existing pavement markings; (2) crack sealing existing runway, taxiway, and apron; (3) sealcoating existing runway, taxiway, and apron; (4) the temporary remarking of the existing runway, taxiway, and apron; (5) the permanent remarking of the existing runway, taxiway, and apron.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents