Similar Projects
Comprehensive Infrastructure for Tampa's Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

Mirror Lake Baffle Box
Infrastructure
Bidding
Fruitland Park, FL 34731

7th Street Extension
Infrastructure
Bidding
Palmetto, FL 34221

Kendall Lake Stormwater Improvements
Post-Bid
Pompano Beach, FL 33060

Bay Drive Stormwater Improvements
Post-Bid
Pompano Beach, FL 33060

South Sewall's Point Road Phase 1
Results
$2,915,034 est. value
Sewall's Point, FL 34996

Furnish and Install 24-Inch Sanitary Force Main Along NW 170 St. from NW 97 Ave. to NW 75 Place, Contract No. S-947
Results
Less than $5,851,177 est. value
Miami, FL

Holmes Beach City Center Roadway Improvements
Infrastructure
Bidding
Holmes Beach, FL 34217

City Of Lynn Haven Push Button Maintenance, Repair and Minor Construction Contract
Post-Bid
Lynn Haven, FL 32444

South Contract 1 L67 A Structures, Spoil Mound Removal, and L 67 C Gapping for the Central Everglades Planning Project
Results
$25,000,000 to $100,000,000 est. value
Miami, FL

Trenchless Pipe Rehabilitation Services
Infrastructure
Bidding
Palm Coast, FL

Taylor Creek Southeast 8th Avenue Stormwater Conveyance
Post-Bid
Okeechobee, FL 34974

Keystone Heights Trail Head
Results
$70,000 to $85,000 est. value
Keystone Heights, FL

Desilt and Video
Infrastructure
Bidding
$330,000 est. value
FL

Hotel Casino Sanitary Sewer And Potable Water System Improvements
Renovation
Post-Bid
Immokalee, FL

Last Updated 01/21/2022 07:16 AM
Project Title

"I" Street Storm Pipe Rehabilitation

Physical Address View project details and contacts
City, State (County) Pensacola, FL 32502   (Escambia County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

General work will include removal of sediment and undesirable materials, dewatering, manhole rehabilitation, and installation of a pipe lining system for the existing stormwater conveyance piping and manholes on "I" Street between Cypress Street and Pensacola Bay.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents