Similar Projects
New West Side Elementary School
New Construction
Conception
Waverly, IA 50677

New Northeast School
New Construction
Conception
Waverly, IA

11th Elementary School
New Construction
Design
Urbandale, IA

2021 Bond Passed - East Mills School District
Addition, Demolition, New Construction, Infrastructure, Renovation
Design
$22,000,000 CJ est. value
Malvern, IA 51551

HVAC Retrofit and Restroom Renovations
Renovation - 1,823 SF
Bidding
$850,000 CJ est. value
Charter Oak, IA 51439

ENP Elementary School
Renovation
Post-Bid
Eldora, IA 50627

DMPS Harding - Monroe - Perkins Floor Finish Replacement Package 2
Renovation, Alteration
Post-Bid
Des Moines, IA 50313

Ankeny Elementary 12
New Construction - 100,500 SF
Results
Ankeny, IA

Restroom Upgrades
Renovation
Results
Des Moines, Pleasant Hill, IA 50312

Emergent #19038 Building Renovation
Renovation - 31,200 SF
Construction
Waterloo, IA 50702

Fort Madison 7-12 and PK-6 - Additions and Renovations - Rebid
Addition, Demolition, Renovation, Infrastructure
Construction
$25,723,839 CJ est. value
Fort Madison, IA 52627

2021 Measure - Boyer Valley Community Schools
Addition, Renovation
Pending Verification
$8,200,000 CJ est. value
Dunlap, IA 51529

Elementary School 12 - 2020 Bond - Waukee Community School District
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Waukee, IA 50263

2020 Bond - New Elementary School - Southeast Polk Community School District
New Construction, Infrastructure
Conception
$25,000,000 CJ est. value
Altoona, IA 50009

Washington Middle School - Washington Community School District
Renovation
Design
$22,000,000 CJ est. value
Washington, IA 52353

Last Updated 07/11/2023 11:35 AM
Project Title

Twain Elementary School Restroom Remodel

Physical Address View project details and contacts
City, State (County) Iowa City, IA 52240   (Johnson County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $265,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

TWAIN ELEMENTARY SCHOOL RESETROOM REMODEL IOWA CITY, IOWA Bid security in the amount of 5% of the total bid in the form of certified check, credit union share draft, or surety bond written on an original AIA Document A310, Bid Bond, is required for this project at the time of Bid. The successful bidder will be required to provide surety Performance and Payment Bonds in an amount equal to one hundred percent (100%) of the Contract Sum Awards of Contract is anticipated to commence on or about June 27, 2023. Work may begin immediately following execution of the agreement and is scheduled to be completed by September 29, 2023, in one phase as shown on the Contract Documents. The right is reserved to reject any and all bids, or any part thereof, and to waive informalities, and to enter into such contract or contracts as shall be deemed in the best interest of the Owner. Deadline to submit Substitution Requests: June 7, 2023, by 5:00pm

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents