Similar Projects
Zero Slater Road
New Construction - 137,500 SF
Conception
$10,000,000 CJ est. value
Morrisville, NC

Gaffney Property
New Construction - 550,000 SF
Conception
$10,000,000 CJ est. value
Charlotte, NC 28217

Bailey Shoppes On Market
New Construction - 15,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Wilmington, NC

Mosaic at Chatham Park Building O
New Construction - 19,912 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Pittsboro, NC 27312

Redevelopment of Moore Square East and South
Renovation
Bidding
Raleigh, NC

Tower V
New Construction - 322,232 SF
Post-Bid
$10,000,000 CJ est. value
Raleigh, NC 27609

Pinnacle Townhomes
New Construction - 159,200 SF
Post-Bid
$10,000,000 CJ est. value
Wilmington, NC 28411

River Oaks Office Renovation
Renovation
Results
Raleigh, NC 27610

Administrative Office Renovations
Renovation
Results
Less than $100,000 est. value
Graham, NC 27253

One Montford Park
Renovation - 146,000 SF
Construction
$6,000,000 to $7,000,000 est. value
Charlotte, NC 28209

Sharon Road Mixed Use
New Construction, Renovation - 178,500 SF
Construction
$10,000,000 CJ est. value
Charlotte, NC 28211

600 South Tryon at Legacy Union
New Construction, Renovation
Pending Verification
Charlotte, NC 28202

Apple Campus and Engineering Hub
New Construction - 1,000,000 SF
Pending Verification
$1,000,000,000 est. value
Raleigh, NC

The Maintenance Team Building
New Construction - 100,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Charlotte, NC 28217

Norwood
New Construction - 21,152 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Charlotte, NC 28227

Last Updated 03/22/2022 04:17 PM
Project Title

Central Maintenance Facility Office Remodel

Physical Address View project details and contacts
City, State (County) Fayetteville, NC 28306   (Cumberland County)
Category(s) Commercial
Sub-Category(s) Office
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $42,667
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work is to reconfigure the three current offices /parts room to create five separate offices and enlarge the parts room to be more efficient. Also, there are some sound proofing insulation needs and wall /ceiling repairs within the Managers office/ bathroom to be addressed as well. A total of four new 3’-0” x 6’-8” wood solid core doors with frames to be constructed into existing walls. A total of two existing doors with frames in offices to be permanently removed, reconstructed, and covered to match existing areas. The existing shop entrance door r (2’-8”x6’-8” door) from the foyer to be replaced with owner provided door.

Details

Office, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents