Similar Projects
Transformer Leak Repairs and Oil Processing 2021
Bidding

Generator Maintenance
Term Contract
Bidding
Tempe, AZ

Electrical Wiring 1-2 and 3-4 Textbook Adoption
Term Contract
Post-Bid
Phoenix, AZ 85012

Provide City of Mesa With Electric Power
Term Contract
Post-Bid
Mesa, AZ 85211

Lewis East Switchgear
Results
Less than $393,065 est. value
Mesa, AZ

Microwave Tower Battery Replacement
Results
Phoenix, AZ 85009

J061--Transformer Inspection and Testing
Bidding
Phoenix, AZ 85012

Electric Meter Testing, Calibration and Repair Services
Term Contract
Post-Bid
Phoenix, AZ

Lewis Substation Transformer
Results
Mesa, AZ 85201

Generators, Accessories, Maintenance and Repair Services
Post-Bid
Phoenix, AZ 85009

Industrial, Building, Plumbing, Electrical, and HVAC Materials
Results
Phoenix, AZ

Electrical and Flooring Supply and Installation
Post-Bid
Glendale, AZ 85051

Streetlight Pole Replacement
Results
Chandler, AZ

Emergency Generator Rental Services
Term Contract
Post-Bid
Mesa, AZ 85211

Preventive Maintenance of Stand-by Generator Sets
Term Contract
Results
Less than $52,000 est. value
Mesa, AZ 85201

Reported 05/08/2020 12:00 AM
Project Title

Invest In Us - An Energy Efficient Upgrade Project

Physical Address View project details and contacts
City, State (County) Phoenix, AZ 85015   (Maricopa County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $450,000 to $500,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Invest in Us project will consist of; upgrading the ARCH's 17-year-old HVAC units with energy efficient units; upgrading the facility's lighting systems and their controls; and replacing existing exterior doors, all of which will increase effectiveness while decreasing the amount of energy we use. We have been depending on the outdated air conditioning units which exceed the standard industry 15-year life expectancy for these types of units and experiencing major failures in these units the last several years. Therefore, we will replace these units with high efficiency equipment meeting or exceeding current energy codes. We will also upgrade and replace the outdated lighting systems and doors which are high energy cost burdens on the facility utility bills due to their age and technology. Rehabilitation work will include: • Update the current 11 outdated HVAC units to energy efficient units that ensure our facility stays in code, is operating to the best of its ability, and is more comfortable for our participants and groups • Update the current lighting system with safer, cooler, energy efficient 60 lights in our facility with a more automated on/off system, thus reducing energy consumption (25 high bay gymnasium lights fixtures;10 track mounted stage light fixtures;12 exterior lights; 3 interior lights;10 parking lot lights) • Update the doors of the facility to create a secure and energy-efficient building with 25, more-effective, airtight doors that do not let the extreme heat inside, thus overworking the HVAC units

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents