Similar Projects
Advance Metering Infrastructure (AMI) System
Bidding
Thornton, CO

Wise Binney Connection Pipeline
Post-Bid
$19,000,000 est. value
Aurora, CO 80111

2020 Sacwsd Water System Removal and Replacements Phase 1
Post-Bid
Commerce City, CO

Water Softening Project 24 Inch Transmission Line
Results
Commerce City, CO

Baseline Waterline and North Tank Drainage Construction Project
Results
Brighton, CO

2020 SACWSD Water System Removal and Replacements Phase 2
Post-Bid
Commerce City, CO 80022

36-Inch Gun Club Rd. Pipeline from E. 26th Ave. to E. 56th Ave
Results
$7,500,000 to $8,100,000 est. value
Aurora, CO 80012

Buckley AFB, Co - Repair & Replace Fire Hydrants
Post-Bid
$1,000,000 to $5,000,000 est. value
Aurora, CO

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Vault and Valve Rehabilitation Program
Post-Bid
$190,000 to $200,000 est. value
Aurora, CO 80012

2020 Hydrant Preventive Maintenance
Results
Less than $75,000 est. value
Commerce City, CO 80022

General Pipeline Maintenance Services Standley Lake Pipeline
Post-Bid
Thornton, CO

60-Inch Gun Club Road Pipeline From East 6th Avenue to I-70
Results
$2,800,000 to $3,000,000 est. value
Aurora, CO 80012

Reservoir Above Water 72 Inch Vault and East Tee (Prime Contractors)
Post-Bid
Less than $2,000,000 est. value
Aurora, CO

Havana Street 30 Inch Water Line Renewal
Results
$2,250,000 to $3,000,000 est. value
Aurora, CO 80012

Last Updated 05/04/2021 05:43 PM
Project Title

2021 PRV Vault Improvements

Physical Address View project details and contacts
City, State (County) Aurora, CO   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000 to $1,700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work to be performed under the 2021 PRV Vault Improvement Project consists of furnishing all labor, materials equipment, tools, supplies including the installation of a new Pressure Relief Valve (PRV) Vault at 13 S Havana St. including 8” and 12” PRV’s, 16” butterfly valves & vaults, yard piping, electrical, instrumentation and controls, heating and ventilation systems, interior lighting, corrosion protection system, site restoration and abandonment of the existing PRV Vault & piping. This work also includes a Control Panel Change-out at an existing PRV Vault at 1951 S Peoria St adding a radio & radio tower package as well as I&C Programming.

Details

Division 26 - Electrical, Interior Lighting.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents