Similar Projects
Parkview Gardens IV
New Construction, Infrastructure
Conception
$19,000,000 CJ est. value
Caledonia, WI 53108

Parkview Gardens IV
New Construction, Infrastructure
Conception
$19,000,000 CJ est. value
Caledonia, WI 53108

Knapp Elementary School - 2020 Bond - Racine Unified School District
Renovation, Infrastructure
Design
$300,000 est. value
Racine, WI 53405

Knapp Elementary School - 2020 Bond - Racine Unified School District
Renovation, Infrastructure
Design
$300,000 est. value
Racine, WI 53405

42-inch Transmission Water Main Phase 3 Mound Avenue to Main Street
Infrastructure
Bidding
$14,300,000 CJ est. value
Racine, WI 53403

42-inch Transmission Water Main Phase 3 Mound Avenue to Main Street
Infrastructure
Bidding
$14,300,000 CJ est. value
Racine, WI 53403

Site Maintenance and Lawn Mowing
Post-Bid
Burlington, WI

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

42-Inch Transmission Water Main Phase 3
Results
$7,500,000 est. value
Racine, WI 53403

W. 6th Street, Bridge Over Root River, P-51-0709
Infrastructure
Construction
$6,734,483 CJ est. value
Racine, WI 53404

W. 6th Street, Bridge Over Root River, P-51-0709
Infrastructure
Construction
$6,734,483 CJ est. value
Racine, WI 53404

Washington Avenue Multi-Family
Demolition, New Construction, Infrastructure
Pending Verification
$37,000,000 CJ est. value
Racine, WI 53403

Washington Avenue Multi-Family
Demolition, New Construction, Infrastructure
Pending Verification
$37,000,000 CJ est. value
Racine, WI 53403

Highway 20 Water Main - West Boulevard to Marquette (Department Of Transportation) - City of Racine
Infrastructure
Conception
$1,000,000 CJ est. value
Racine, WI 53403

Last Updated 11/02/2022 02:33 PM
Project Title

College Avenue Brick Paver Intersections 17th to 18th

Physical Address View project details and contacts
City, State (County) Racine, WI 53403   (Racine County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $369,357 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: City of Racine The intersection of College ave. and 17th St. The intersection of College ave. and 18th St. Project Category Code: Roadway Lighting, Aggregate, Concrete Pavement, Sawcutting/Sidewalk/Pavement, ADA Curb Ramps, Pavement Removal, Excavation, Stormwater Improvements, Pavers/Permeable Pavers, Street/Road Intersection Improvements Description: Historic Brick Paver intersections, other work includes: sanitary, storm sewer, stained crosswalks, sidewalks, curb and gutter, manholes, lawn, electrical and parkway restoration. Est. Completion Date: Aug. 5, 2022 Pre-Qualification: Yes

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents