Similar Projects
Snow Removal Services, Cargo Inspection Facility, Detroit, MI
Design
Detroit, MI 48216

Snow Blowing and Snow Removal Services
Post-Bid
Sault Sainte Marie, MI 49783

Seasonal Snow Removal
Post-Bid
Mount Pleasant, MI

Snow Removal for DEQ 635 Filley Street District Office
Results
Lansing, MI

Waste Disposal and Recycling Services
Results
Less than $60,000 est. value
Wayne, MI

2019-2020 Snow Removal
Post-Bid
Niles, MI

Lawn Mowing/Snow Removal
Results
Less than $1,860 est. value
Port Huron, MI

Snow Removal and Ice Management Services for the 2019/2020 Snow Season for the Romulus Athletic Center.
Term Contract
Post-Bid
MI

Dart Auditorium-Fire Curtain And Rigging Replacement
Results
Pinckney, MI

Snow Removal Services - Multiple Sites
Post-Bid
Detroit, MI

Property Maintenance
Term Contract
Results
Kalamazoo, MI

Bridge Icicle Removal
Term Contract
Post-Bid
MI

Neighborhood Stabilization Program - Right of First Refusal
Results
Garden City, MI

Hillman Fire Department Snow Removal
Post-Bid
Hillman, MI 49746

Aqueous Film Forming Foam (Afff) Collection and Disposal
Results
Lansing, MI

Last Updated 04/10/2020 02:29 AM
Project Title

DNR Muskegon State Park - 2020 Sand Relocation Project

Physical Address View project details and contacts
City, State (County) North Muskegon, MI   (Muskegon County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Remove all sand accumulations from between the parking lots, from paved roadways, from paved parking lots, from around the beach building and sidewalks, from the east shoulder of the park road, and from both sides of the park road north and south of the parking lot a distance to be established by the Park Supervisor. 2. The shoulders of the park road and the north and south ends of the parking lots are to be cleared a minimum of 12 feet but not more than 15 feet from the paved edge on a level grade even with the road surface. 3. Sand areas located between concrete surfaces or roads and parking lots must be excavated and finished to a grade no higher than the surrounding paved surfaces. 4. Sand must be removed from around all steps and sidewalks associated with the beach house. Final grades in the proximity of the bathhouse are to be determined by the Park Supervisor or his representative and are to be semi-finish grade. 5. All sand that has been removed shall be deposited and rough graded on the beach or low areas in the parking lot medians or the building. 6. Grading on the beach is to be a gradual slope from the parking lot edge to the water’s edge of Lake Michigan as determined by the Park Supervisor or his representative.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents