Similar Projects
Pot Creek Lop and Scatter
Bidding
UT

1970 South 1200 West Street Construction Project
Bidding
Woods Cross, UT 84087

Antelope Flat Lop and Scatter
Post-Bid
UT

Miller Creek Lop and Scatter
Term Contract
Post-Bid
Salt Lake City, UT 84114

Castle Valley Lop and Scatter
Term Contract
Results
$50,000 to $60,000 est. value
Salt Lake City, UT 84114

Lower Hickman Canyon Bullhog
Term Contract
Results
Less than $213,798 est. value
Salt Lake City, UT 84114

Upper Horse Hollow Phase 2 Bullhog
Post-Bid
Less than $100,000 est. value
UT

Broad Hollow Bullhog
Results
Less than $300,000 est. value
Glendale, UT 84729

Yellow Jacket (Coral Pink) Bullhog
Post-Bid
$150,000 to $200,000 est. value
UT

Southern Utah December 2019 Aerial Seeding
Results
$50,000 to $60,000 est. value
Salt Lake City, UT

Pinto Bullhog
Term Contract
Post-Bid
Cedar City, UT

South Canyon Sevier River Bullhog
Results
Hatch, UT 84735

South Bookcliffs Nash Lop and Scatter
Post-Bid
Moab, UT

2020 Spring Tree Planting
Results
West Jordan, UT

Kanarra Ridge Far East Mechanical Fuels Reduction
Post-Bid
New Harmony, UT

Last Updated 11/17/2020 04:58 AM
Project Title

Monroe Mountain Private Aspen Regeneration

Physical Address View project details and contacts
City, State (County) Richfield, UT   (Sevier County)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This remote property is located in Sevier County. Please see attached maps for the general project location. Cell phone communication is sparse in the project areas. The nearest lodging is hotels in Richfield, Utah. Legal Description: Township 25 South, Range 2 West, Portions of Section 26, and 35. Acreage: approximately 123 acres - dependent upon budget constraints. Services in this contract to provide for the removal of live, standing dead, and down dead trees on up to 123 acres (price dependent) on private property in Sevier County. The project area is scattered throughout Monroe Mountain and the terrain is generally gently sloped areas next to dirt roads. The goal of the project is to open up the ground to encourage the regeneration of fire resistant aspen. Aspen regeneration requires bare soil with exposure to sunlight, therefore all woody material will be piled within the cut boundary. The Contractor shall supply all labor, equipment, supervision, transportation, supplies, lodging/ camping arrangements, and incidentals to perform all work as set forth in these specifications.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents