Similar Projects
Londonderry Court - City of Laurel
Infrastructure
Conception
$250,000 est. value
Laurel, MD 20707

Van Dusen Road Phase 1 - Killbarron Drive to Contee Road - city of Laurel
Infrastructure
Conception
$831,000 est. value
Laurel, MD 20723

West Nursery Commercial Center
Design
Linthicum Heights, MD 21090

HC Properties Phase I - Plan A and Plan B
Build-out, Infrastructure - 94,412 SF
Design
$10,000,000 CJ est. value
Baltimore, MD 21230

Crownsville State Veterans Cemetery Carillon Bell Tower Refurbishment
Infrastructure
Bidding
$300,000 CJ est. value
Crownsville, MD 21032

Defense Logistics Agency Site Improvements
Infrastructure, Renovation
Bidding
$25,000,000 CJ est. value
Fort Meade, MD 20755

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Metro Reisterstown Plaza Station ADA Improvements and Stair No 2 Replacement
Infrastructure
Post-Bid
$1,000,000 to $2,500,000 est. value
Hanover, MD

Eastbound William Preston Lane Jr. Memorial (Bay) Bridge Deck Replacement Phase 1 Deck Truss Spans T1-T13 and T14-T22
Results
$500,001 to $1,000,000 est. value

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

Beverly Triton Nature Park
New Construction
Construction
$3,000,000 est. value
Edgewater, MD 21037

Beverly Triton Nature Park
New Construction
Construction
$3,000,000 est. value
Edgewater, MD 21037

Southdale Shopping Center - 3 Restaurant Pad Sites
Infrastructure
Pending Verification
Glen Burnie, MD 21060

Van Dusen Road Phase 1 - MD 198 to Cherry Lane - City of Laurel
Infrastructure
Conception
$1,245,000 est. value
Laurel, MD 20723

City Dock Stormwater and Flood Mitigation Improvements
New Construction, Renovation, Infrastructure
Design
$1,400,000 CJ est. value
Annapolis, MD 21401

Last Updated 08/24/2022 08:36 AM
Project Title

WB & A Trail - P393600 - Anne Arundel County

Physical Address View project details and contacts
City, State (County) Annapolis, MD 21401   (Anne Arundel County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2026
Bids Due View project details and contacts
Estimated Value $15,776,270 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project authorizes the right of way acquisition, design and construction of a paved multiuse trail primarily on the abandoned roadbed of the former W B & A Railroad south of Odenton. When complete, the project will link the South Shore Trail in Odenton with the Patuxent River and an existing rail trail in Prince George's County. The W B & A Trail will be a component of the East Coast Greenway and the American Discovery Trail.Construction of this recreational and transportation corridor will be done in phases: Phase I - Odenton Road to Strawberry Lake Way Phase II A - Strawberry Lake Way to Conway Road (bridges) Phase II B - Strawberry Lake Way to Conway Road (paving) Phase III - Conway Road to Patuxent River Phase IV - Loop from Strawberry Lake Way to South Shore Trail Phase V - Bridge over the Patuxent River As of August 24, 2022, this project is currently in the FY 2023-2028 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2026. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents