Similar Projects
RFP Design - Rehabilitation of Runway 11-29, Worcester Regional Airport
Infrastructure
Conception
$1,000,000 CJ est. value
Worcester, MA 01602

RFP Design - Rehabilitation of Runway 11-29, Worcester Regional Airport
Infrastructure
Conception
$1,000,000 CJ est. value
Worcester, MA 01602

Richards Street Multi-Residential Development
New Construction, Infrastructure
Design
$3,000,000 est. value
Worcester, MA 01603

Afonso Village
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Grafton, MA 01519

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Water Main Replacement
Infrastructure
Results
$1,400,000 est. value
Shrewsbury, MA

District 5 - Scheduled and Emergency Pavement Repairs and Improvements at Various Locations (Excluding the Islands)
Infrastructure
Results
$719,100 est. value

Auburn Commerce Park Site Development
New Construction
Construction
Auburn, MA 01501

Chilmark Street Townhomes
New Construction, Infrastructure
Construction
$1,500,000 CJ est. value
Worcester, MA 01604

Salisbury Pine Tree Estates
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Holden, MA 01520

Salisbury Pine Tree Estates
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Holden, MA 01520

Research Drive Life Sciences Park
Demolition, New Construction, Infrastructure - 715,000 SF
Conception
$80,000,000 CJ est. value
Westborough, MA 01581

RFQ D/B - Hopkinton-Westborough - Interchange Improvements, Interstate 495 (NB and SB) at Interstate 90 (EB and WB)
Infrastructure
Post-Bid
$339,185,107 CJ est. value
Hopkinton, MA 01748

Scheduled and Emergency Highway Maintenance and Repairs at Various Locations
Infrastructure
Results
$1,156,172 est. value

Last Updated 05/25/2023 12:03 AM
Project Title

Northeast Sutton Sewer Improvement Project

Physical Address View project details and contacts
City, State (County) Sutton, MA 01590   (Worcester County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $4,049,526 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of installing new sanitary sewer force main, sewer gravity main, a new submersible sewer pump station, wet well, valve vault, and metering pit on Providence Road. The Work also consists of cured-in place lining, air release valves, blow-off valves, a new grinder pump station and low-pressure service on Providence Road, new gravity sewer services, and full-width milling and overlay on Providence Road. There shall also be approximately 900 linear feet of 4-inch HDPE sewer force main slip lining through existing 8-inch asbestos cement force main on Blackstone Street in Sutton, MA, and 320 linear feet of new 4-inch PVC sewer force main, and a new submersible sewer pump station on Blackstone Street included in the work.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents