Similar Projects
Glenwood St, Goddard Rd / US 20/26 (Chinden Blvd) - Ada County Highway District
Infrastructure
Conception
$762,000 est. value
Boise, ID

Maple Grove Road and Edna Street Pedestrian Crossing - Ada County Highway District
Infrastructure
Conception
$245,000 est. value
Boise, ID 83704

RFQ D/B - Student Residence Hall
New Construction, Infrastructure
Design
$4,181,379 CJ est. value
Boise, ID 83706

Lewiston Regional Office Facility Improvements - Phase II
New Construction, Infrastructure, Renovation
Design
$1,000,000 CJ est. value
Boise, ID 83702

Spring Valley Water Storage Reservoirs No.1 and No.2
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Meridian, ID 83642

Spring Valley Water Storage Reservoirs No.1 and No.2
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Meridian, ID 83642

2023 Liquid Asphalt
Term Contract
Sub-Bidding
Garden City, ID 83714

2023 Polyvinyl Chloride (PVC) Pipe
Term Contract
Sub-Bidding
Garden City, ID 83714

Creason Pathway Construction
Infrastructure
Post-Bid
Meridian, ID

Dust Abatement Dirt Roads
Term Contract
Post-Bid
Dixie, Elk City, Meridian, ID 83525

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

Widening SH-21 Between MP 0.787 and 3.023
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
ID

Idaho Street Mixed-Use Building
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Boise, ID 83702

Lavender Heights Residential Development / Meridian
New Construction, Infrastructure
Pending Verification
$92,000,000 CJ est. value
Meridian, ID 83642

RFP Design - Design Plans for Pickles Butte Sanitary Landfill Gas Collection Project
Alteration
Conception
Boise, ID

Last Updated 08/16/2022 10:02 AM
Project Title

Harvard Street Closure

Physical Address View project details and contacts
City, State (County) Boise, ID 83705   (Ada County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,100,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the construction of two paved cul-de-sacs, including associated drainage, lighting, signage, and landscaping. The relocation of the FAA's main access gate, including associated electrical and communication utilities, as well as relocating the existing visitor parking, solid waste area, mailbox, and monuments. Installation of new security fencing within the vicinity of the cul-de-sacs is also included. Deadline for questions, clarifications, and or equal requests shall be received no August 10, 2022, 5:00 P.M. MDT

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents