Similar Projects
Parallel Taxiway Rehabilitation at Sullivan County International Airport
Post-Bid
Less than $2,500,000 est. value
Bethel, NY 12720

Parallel Taxiway Reconstruction, Widening, and MITL Reconstruction at Potsdam Municipal Airport
Post-Bid
Less than $1,900,000 est. value
Potsdam, NY 13676

Watertown International Airport Runway 7-25 and Intersection Rehabilitation Project
Results
Watertown, NY 13601

Repair Aircraft Parking Apron & Shoulders
Results
$1,000,000 to $5,000,000 est. value
Newburgh, NY

Skaneateles Aerodrome Runway 10 Safety Improvements 2020
Construction
Skaneateles, NY 13152

Terminal Exit Lane Improvement Project
Post-Bid
Syracuse, NY 13212

Rehabilitate and Reconstruct Taxiway D
Results
Less than $3,000,000 est. value
Niagara Falls, NY 14304

Construction of Taxiways A and E Rehabilitation Phase II at Ithaca Tompkins Regional Airport
Post-Bid
Ithaca, NY 14850

Wellsville Municipal Airport Runway 10-28 Rehabilitation
Results
$2,500,000 to $3,500,000 est. value
Wellsville, NY 14895

Taxiway Rehabilitation at Le Roy Airport
Renovation
Post-Bid
$372,000 est. value
Le Roy, NY 14482

Runway 5-23 Rehabilitation - Contract 1
Results
Saranac Lake, NY 12983

Exit Lane Monitors at Greater Rochester International Airport
Term Contract
Post-Bid
Rochester, NY 14624

East Apron Pavement Rehabilitation at the Greater Rochester International Airport
Results
Rochester, NY 14614

Apron Reconstruction
Post-Bid
Batavia, NY 14020

North Apron Reconstruction
Results
Ghent, NY 12075

Last Updated 05/27/2021 11:49 AM
Project Title

Taxiway E Extension at Griffiss International Airport

Physical Address View project details and contacts
City, State (County) Rome, NY 13441   (Oneida County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of new Taxiway E connector, approximately 460 FT long and 50 FT wide with paved shoulders, located between the intersection of Taxiway E and F and extending to Apron 4. The taxiway connector will use approximately 860 FT of existing concrete pavement at 75 FT wide which is currently closed and requires rehabilitation. Project tasks include profile cold milling, pavement excavation, concrete pavement rubblizing, bituminous asphalt pavement, underdrain installation, utilities, turf grading, pavement markings and taxiway lighting and signage modifications.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents