Last Updated | 02/28/2023 08:12 AM |
Project Title | Hot Mix Asphalt Reconstruction, Drainage, Roundabout Construction, Traffic Signal Modifications, Signing, Freeway Lighting, Water Main Relocation guardrail |
Physical Address | View project details and contacts |
City, State (County) | Marshfield, WI 54449 (Wood County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $32,842,312 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 5.68 mi of hot mix asphalt reconstruction, drainage, roundabout construction, traffic signal modifications, signing, freeway lighting, water main relocation, guardrail, landscaping and pavement markings and bridge reconstruction with 36-inch x 49-inch precast concrete bulb-tee beams and bridge rehabilitation including deck patching, substructure patching, shallow overlay and waterproofing membrane on US-10 westbound from Seven Mile Road to the west city limits of Bay City, Bay County. This project includes a 5 year materials and workmanship pavement warranty and a 2 year performance warranty on concrete surface coating. Control Sec Job No Federal No NH 09101 201403A 23A0190 NH 09101 202144A 23A0184 NH 09101 204851A 23A0185 Net classification required for this project is 36683 Cb or 36683 Ea In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb, Ea and Fa. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. MI DOT - 2302 006 - Hot Mix Asphalt Reconstruction, Drainage, Roundabout Construction, Traffic Signal Modifications, Signing, Freeway Lighting, Water Main Relocation guardrail After award, start work on the date approved by the Engineer, which must be no earlier than April 17, 2023. In no case may any work be commenced prior to award by the Department. All contract work associated with Pre-Stage must be completed by the interim completion date of May 24, 2023. All contract work associated with Stage 1 must start no earlier than May 25, 2023 and must be complete by the interim completion date of June 29, 2023. All contract work associated with Stage 2 must start no earlier than July 10, 2023 and must be complete with all roadways and bridges completely open to traffic by the interim completion date of November 3, 2023. All contract work associated with Stage 3 must start no earlier than April 15, 2024 and must be complete by the interim completion date of May 2, 2024. All contract work associated with Stage 4 must start no earlier than May 3, 2024 and must be complete with all roadways and bridges completely open to traffic by the interim completion date of November 1, 2024. The entire project, including establishment of slope restoration, must be complete by the final completion date of June 13, 2025. |
||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||