Similar Projects
Blueberry Road
Infrastructure
Design
$410,000 CJ est. value
Milladore, WI 54454

Blueberry Road
Infrastructure
Design
$410,000 CJ est. value
Milladore, WI 54454

T Rock, Lynn Line Road, E Fork Black River Bridge
Demolition, New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Pittsville, WI 54466

T Rock, Lynn Line Road, E Fork Black River Bridge
Demolition, New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Pittsville, WI 54466

Parking and Motorcycle Training Lot
Post-Bid
Marshfield, WI 54449

Babcock - Nekoosa, CTH G (N) - STH 73
Infrastructure
Post-Bid
$1,000,000 to $1,999,999 est. value
Babcock, Nekoosa, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

North Road from Tower Road Intersection South to Maple Road
Results
Auburndale, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Caribou Coffee -8th Street / Wisconsin Rapids
New Construction, Infrastructure - 300 SF
Pending Verification
$100,000 CJ est. value
Wisconsin Rapids, WI 54494

West 2nd Street Redevelopment
New Construction, Infrastructure
Pending Verification
$21,000,000 CJ est. value
Marshfield, WI 54449

2023 Concrete Contract for Reconstruction Projects
Infrastructure
Bidding
$580,000 CJ est. value
Wisconsin Rapids, WI 54494

C Wisconsin Rapids, Various Streets
Infrastructure
Post-Bid
$4,000,000 to $4,999,999 est. value
Pittsville, WI

Polymer Overlay
Infrastructure
Results
WI

Last Updated 02/28/2023 08:12 AM
Project Title

Hot Mix Asphalt Reconstruction, Drainage, Roundabout Construction, Traffic Signal Modifications, Signing, Freeway Lighting, Water Main Relocation guardrail

Physical Address View project details and contacts
City, State (County) Marshfield, WI 54449   (Wood County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $32,842,312 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

5.68 mi of hot mix asphalt reconstruction, drainage, roundabout construction, traffic signal modifications, signing, freeway lighting, water main relocation, guardrail, landscaping and pavement markings and bridge reconstruction with 36-inch x 49-inch precast concrete bulb-tee beams and bridge rehabilitation including deck patching, substructure patching, shallow overlay and waterproofing membrane on US-10 westbound from Seven Mile Road to the west city limits of Bay City, Bay County. This project includes a 5 year materials and workmanship pavement warranty and a 2 year performance warranty on concrete surface coating. Control Sec Job No Federal No NH 09101 201403A 23A0190 NH 09101 202144A 23A0184 NH 09101 204851A 23A0185 Net classification required for this project is 36683 Cb or 36683 Ea In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb, Ea and Fa. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. MI DOT - 2302 006 - Hot Mix Asphalt Reconstruction, Drainage, Roundabout Construction, Traffic Signal Modifications, Signing, Freeway Lighting, Water Main Relocation guardrail After award, start work on the date approved by the Engineer, which must be no earlier than April 17, 2023. In no case may any work be commenced prior to award by the Department. All contract work associated with Pre-Stage must be completed by the interim completion date of May 24, 2023. All contract work associated with Stage 1 must start no earlier than May 25, 2023 and must be complete by the interim completion date of June 29, 2023. All contract work associated with Stage 2 must start no earlier than July 10, 2023 and must be complete with all roadways and bridges completely open to traffic by the interim completion date of November 3, 2023. All contract work associated with Stage 3 must start no earlier than April 15, 2024 and must be complete by the interim completion date of May 2, 2024. All contract work associated with Stage 4 must start no earlier than May 3, 2024 and must be complete with all roadways and bridges completely open to traffic by the interim completion date of November 1, 2024. The entire project, including establishment of slope restoration, must be complete by the final completion date of June 13, 2025.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents