Project Title | Athletic Flooring Refurbishing at Science Hill High School |
Physical Address | View project details and contacts |
City, State (County) | Johnson City, TN 37604 (Washington County) |
Category(s) | Single Trades |
Sub-Category(s) | Flooring |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected June 2022 |
Bids Due | View project details and contacts |
Estimated Value | $24,940 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The contractor shall provide all labor, materials, equipment, supervision and supplies as required to repair/sand SHHS Gym athletic floor. Quotes should reflect the cost of all materials and labor for demolition of existing base,, inspection and repair of any damaged athletic floor, sanding, finishing, install game lines and logo. Gym floor is approximately 13,400 square feet, constructed over a concrete slab. The dimensions referred to in the description of work regarding work area in reference to the gym floor are the best obtainable, available data, but are not guaranteed by the Owner and neither shall be responsible for their accuracy or completeness. Prior to proceeding with any work the contractor shall verify in the field all dimensions or conditions necessary to avoid construction errors. No additional compensation shall be borne by the Owner due to the failure of the Contractor or his subcontractors to properly coordinate the work with existing conditions. It shall be the Contractor's responsibility to satisfy themselves to the accuracy of all measurements during the construction process. Time is of the essence to this project. Project can begin on June 13, 2022 and must be completed no later than July 15, 2022- this will be the Project completion date and an award consideration. Successful Contractor/firm will coordinate all work and product delivery with the School's Athletic Director |
||
Details | 13,400 SF.
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |