Similar Projects
New Multipurpose Event Center (MPEC)
Renovation - 5,500 SF
Post-Bid
TN

Flooring and Rubber Base
Post-Bid
TN

Franklin High School Gym Floor Replacement
Results
Franklin, TN 37064

HOC Northwest Building
Renovation
Results
Knoxville, TN

Carpet Replacement
Post-Bid
TN

Athletic Flooring Re-Furbishing - Indian Trail
Alteration
Results
Johnson City, TN 37601

VCT Flooring - Howard Elementary
Post-Bid
Gallatin, TN 37066

Concrete Flooring Repair
Alteration
Results
Dandridge, TN 37725

Cosby High School Gymnasium Floor
Post-Bid
Cosby, TN 37722

Floors and Roof Trusses for the New Veterans Building
Alteration
Results
Cookeville, TN 38501

Floor Tile Replacement
Post-Bid
TN

Public Works Office Flooring
Infrastructure
Results
Crossville, TN

Flooring Abatement for Haywood Elementary and Eastside Intermediate Schools
Alteration
Post-Bid
Brownsville, TN 38012

College Hill Recreation Flooring
Alteration
Results
Cleveland, TN

Carpet-System Wide
Alteration
Post-Bid
Clarksville, TN

Last Updated 09/16/2022 04:10 PM
Project Title

Athletic Flooring Refurbishing at Science Hill High School

Physical Address View project details and contacts
City, State (County) Johnson City, TN 37604   (Washington County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $24,940 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall provide all labor, materials, equipment, supervision and supplies as required to repair/sand SHHS Gym athletic floor. Quotes should reflect the cost of all materials and labor for demolition of existing base,, inspection and repair of any damaged athletic floor, sanding, finishing, install game lines and logo. Gym floor is approximately 13,400 square feet, constructed over a concrete slab. The dimensions referred to in the description of work regarding work area in reference to the gym floor are the best obtainable, available data, but are not guaranteed by the Owner and neither shall be responsible for their accuracy or completeness. Prior to proceeding with any work the contractor shall verify in the field all dimensions or conditions necessary to avoid construction errors. No additional compensation shall be borne by the Owner due to the failure of the Contractor or his subcontractors to properly coordinate the work with existing conditions. It shall be the Contractor's responsibility to satisfy themselves to the accuracy of all measurements during the construction process. Time is of the essence to this project. Project can begin on June 13, 2022 and must be completed no later than July 15, 2022- this will be the Project completion date and an award consideration. Successful Contractor/firm will coordinate all work and product delivery with the School's Athletic Director

Details

13,400 SF.
Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents