Similar Projects
Replace Chiller CNR - 23251 - Idaho Department of Administration
Renovation
Conception
$724,500 CJ est. value
Boise, ID 83702

Janssen Engineering Building HVAC Phase 4 - 23253 - Idaho Department of Administration
Renovation
Conception
$548,700 CJ est. value
Boise, ID 83702

RFQ D/B - Student Residence Hall
New Construction, Infrastructure
Design
$4,181,379 CJ est. value
Boise, ID 83706

Upgrade HVAC and Electrical - Riverfront Hall
Renovation
Design
$1,830,000 CJ est. value
Boise, ID 83725

RFP - Boise Center Public-Private Partnership Development
New Construction, Infrastructure
Bidding
$996,662 CJ est. value
Boise, ID 83702

Radio System, Campus Wide
Renovation
Bidding
$237,412 CJ est. value
Boise, ID 83702

RFQ Construction Manager - College of Pharmacy Research Labs, Idaho State University, Pocatello, Idaho
Renovation
Post-Bid
$16,800,000 CJ est. value
Pocatello, ID 83201

Classroom Improvements, Various, Boise State University
Renovation
Post-Bid
$925,000 est. value
Boise, ID 83725

Renovations, Upgrades, Labs Science Building
Renovation
Results
$1,450,000 est. value
Boise, ID 83725

Albertsons Library 1st Floor Renovations
Renovation
Results
$200,000 est. value
Boise, ID 83706

RFQ Contractor - Fiber Optic Cable Loop Phase 2
Infrastructure
Design
$240,000 CJ est. value
Boise, ID 83725

Boise River Cafe, Remodel, Phase 2, Sub
Renovation
Post-Bid
$385,000 est. value
Boise, ID

ADA Surveys / Improvements, Boise State University - Rebid
Renovation
Results
$551,900 CJ est. value
Boise, ID 83725

Taylor Hall Stair Replacement Boise State University
Renovation
Post-Bid
$575,000 CJ est. value
Boise, ID 83706

New DL Classroom 817, Idaho State University
Renovation
Results
$389,950 CJ est. value
Meridian, ID 83642

Last Updated 03/22/2023 05:13 PM
Project Title

BSU: Elevator Repairs, Upgrades & Modernizations Re-bid-02

Physical Address View project details and contacts
City, State (County) Boise, ID 83725   (Ada County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $640,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 22 the project has not yet been awarded. A timeline for award has not yet been established . A description of the work of this project can be summarized to include the modernization of three (3) elevators in separate buildings on the Boise State campus: A three-stop hydraulic elevator in the Math Building, a twostop hydraulic elevator in the Communications Building and a three-stop hydraulic elevator in the Ruch Engineering Building including associated building, mechanical, electrical and fire alarm upgrades. Waterproofing of the pit in the Math Building is also included. A bid bond in the amount of 5% of the total bid amount, including any add alternates, is required. A Public Works Contractor's License for the State of Idaho is required to bid on this work. Bidder hereby agrees to commence Work under this Contract on a date to be specified in the written "Notice to Proceed" of the Owner and to substantially complete the Project within Two hundred fifty-nine (259) consecutive calendar days thereafter, as stipulated in the specifications. Bidder further agrees to substantially complete the work in four phases as follows: Phase 1, Elevator procurement and delivery within one hundred fifty-four (154) consecutive calendar days; Phase 2, Modernize Math Elevator No. 2, within forty-two (42) consecutive calendar days of Substantial Completion of Phase 1; Phase 3, Modernization of Ruch Engineering Elevator No. 1, within forty-two (42) consecutive calendar days of the Substantial Completion of Phase 2 ; Phase 4, Modernize Communications Building Elevator No.1, within thirty-five (35) consecutive calendar days of the Substantial Completion of Phase 3. Bidder further agrees to pay as liquidated damages the sums listed below for each phase individually and separately for each consecutive calendar day after the established substantial completion dates or adjusted dates as established by Change Order: Phase 1: $500 (Five Hundred Dollars); Phase 2: $500 (Five Hundred Dollars); Phase 3: $500 (Five Hundred Dollars); Phase 4 and Entire Project: $500 (Five Hundred Dollars).

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents