Similar Projects
Daytona Beach Courthouse Annex Ramp Renovation
Infrastructure
Bidding
$175,000 est. value
Daytona Beach, FL 32114

Snook Park - Parking and Boardwalk Improvements
Infrastructure
Bidding
$206,060 est. value
Deltona, FL 32738

Daytona Campus - Parking Lots A, B and C
Post-Bid
Daytona Beach, FL 32114

Fleming Avenue ADA Sidewalk
Results
Less than $70,500 est. value
De Land, FL 32720

Orange City Votran Parking Lot
Results
Less than $715,000 est. value
Orange City, FL 32763

Beechdale Park - Parking and Boardwalk Improvements (Phase II)
Infrastructure
Bidding
$229,610 est. value
Deltona, FL 32725

Spring to Spring Trail, 3B, Rob Sullivan Park to Dirksen
Results
Less than $2,575,000 est. value
DeBary, FL 32713

ADA and Visitor Parking and Ramp for VIA Hall
Infrastructure
Bidding
Oak Hill, FL 32759

Lime Tree Drive ADA Sidewalk Project
Results
Less than $155,000 est. value
Edgewater, FL 32132

Construct Concrete ADA Parking Spaces
Infrastructure
Bidding
Oak Hill, FL 32759

Derbyshire Neighborhood Sidewalks Phase 1 - Third Street and Vine Street
Results
$589,000 to $763,000 est. value
Daytona Beach, FL 32100

Allen Green Center Parking Lot Sealcoating
Results
Port Orange, FL

Blue Spring State Park - ADA Boardwalk Replacement
Results
Less than $156,372 est. value
Orange City, FL 32763

Daytona Beach International Airport Parking Lot Improvements
Results
Less than $2,907,229 est. value
Daytona Beach, FL 32114

Jefferson Street Parking Lot
Results
New Smyrna Beach, FL 32168

Last Updated 10/28/2021 10:20 AM
Project Title

As Needed New Sidewalk Installation and Repairs

Physical Address View project details and contacts
City, State (County) Deltona, FL   (Volusia County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Vendor/Contractor to provide new sidewalk installations and repairs of existing sidewalks on an as needed basis in accordance with the specifications within this bid and all applicable code requirements. Effective date for this contract is estimated to begin on October 1, 2021. Terms of this agreement shall be for two (2) years with three (3) additional one (1) year renewal periods upon mutual agreement by both parties.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents