Similar Projects
Centre Station
New Construction, Demolition - 4,058 SF
Conception
Brockton, MA

Keene Street Subdivision
New Construction
Conception
Duxbury, MA

Campello Place
New Construction
Design
Brockton, MA 02301

Rochester Crossroads
New Construction - 52,400 SF
Design
Rochester, MA

ADA Unit 82 Repair Including New Kitchen Cabinetry
Renovation
Post-Bid
Less than $35,000 est. value
Scituate, MA 02066

Create Two Fully-Accessible Units - General Bid
Renovation
Post-Bid
$436,000 est. value
Rockland, MA

Accessibility Improvements Units 42A and 42B, Hemlock Drive 667-2 - General Bid
Renovation, Addition
Results
Less than $261,000 est. value
Bridgewater, MA 02324

Accessibility Improvements Units 42A and 42B, Hemlock Drive 667-2 - Sub Bid
Renovation, Addition
Results
$261,000 est. value
Bridgewater, MA 02324

Main Street Mixed Use
New Construction
Construction
Brockton, MA 02301

Viva Lakeshore Center
New Construction - 660,000 SF
Construction
Less than $16,008,903 est. value
Bridgewater, MA 02324

Rainier Colony Place Mixed Use
Renovation
Pending Verification
Plymouth, MA 02360

Main Street Redevelopment
New Construction, Renovation
Conception
Brockton, MA 02301

Petronelli Way Apartments
Renovation
Design
Brockton, MA

Oak Street School Conversion - Filed Sub-Bids
Renovation
Post-Bid
$540,000 est. value
Plymouth, MA 02360

Roof Replacement and HVAC Repairs, Richard J. Sergi Administration Building - General Bids
Renovation
Results
Less than $399,600 est. value
Brockton, MA 02301

Reported 12/31/2021 12:00 AM
Project Title

Oak Street School Conversion - General Bids

Physical Address View project details and contacts
City, State (County) Plymouth, MA 02360   (Plymouth County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $540,000
Plans Available from Municipal Agency - 12/01/21
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate. The project consists of conversion of existing two room schoolhouse into three, one bedroom apartments, with one being a fully accessible unit meeting ADA/MAAB requirements

Details

Apartments/Condominiums, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents