Similar Projects
2023 Sanitary Sewer Rehabilitation by Full Length CIPP Lining
Infrastructure
Bidding
$1,000,000 CJ est. value
New Baltimore, MI 48051

Feasibility Analysis of Select Stormwater Projects
Infrastructure
Bidding
$1,000,000 CJ est. value
Ann Arbor, MI 48104

Wholesale Water Meter Pit Rehabilitation and Meter Replacement Phase II
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Detroit, MI 48226

As Needed Plumbing at City Facilities
Term Contract
Sub-Bidding
Farmington Hills, MI 48334

Residential Plumbing Contractor
Post-Bid
Detroit, MI

Installation and Testing of 6" Deringer 20X Backflow Preventer
Alteration
Post-Bid
Warren, MI 48089

FMO Plumbing and Heating Services
Alteration
Results
Waterford, MI

Steam Vaults 29 and 33 Repairs
Alteration
Results
Less than $100,000 est. value
Houghton, MI

Pontiac, Swift, Moore and Wright Watermain and Resurfacing Project
Infrastructure
Bidding
$1,000,000 CJ est. value
Ann Arbor, MI 48104

Lane Lines for Dunworth Pool
Infrastructure
Sub-Bidding
$1,000,000 CJ est. value
Dearborn, MI 48126

Drinking Water Filtration
Alteration
Post-Bid
Houghton Lake, MI 48629

Upgrade to Potable Water Risers Construction
Alteration
Results
$1,000,000 to $5,000,000 est. value
Iron Mountain, MI 49801

Electrical Grounding for Lead Line Replacement
Infrastructure
Bidding
$1,500,000 CJ est. value
Jackson, MI 49201

Backflow Preventers-Testing & Inspection, And General Plumbing Services
Term Contract
Post-Bid
Grand Rapids, MI

Type K Copper Tubing
Term Contract
Results
Troy, MI

Last Updated 04/21/2023 03:07 PM
Project Title

B2B Trail Construction in Lyndon and Lima Townships Along M-52 and Dexter-Chelsea Roads

Physical Address View project details and contacts
City, State (County) Sylvan Township, MI 48118   (Washtenaw County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Delivery Point Washtenaw County, Michigan Question Acceptance Deadline 02/28/2023 05:00 PM EST Questions are submitted online No The Washtenaw County Parks and Recreation Commission (WCPARC) is issuing a Request for Proposal (RFP) #8425 for B2B Trail Construction In Lyndon And Lima Townships. The work in this RFP includes the construction of two Border To Border Trail (B2B) Projects: 1.6 miles in Lyndon Township and 0.45 miles in Lima Township. Work includes installation of HMA or concrete paving, aggregate base, a 30-foot pedestrian bridge, boardwalk, retaining wall, earthwork, drainage structures, curb and gutter, pavement marking, signs, brush and stump removal, tree planting, site restoration, and related work. All work shall be substantially complete and open for public use by June 10, 2024. All work, including Watering and Cultivating, shall be completed by October 1, 2025. See each progress clause for further details.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents