Similar Projects
Shining Mountain Waldorf School - Master Plan - 11.6 acres
New Construction, Addition - 146,596 SF
Conception
Boulder, CO 80304

Costco / Longmont
New Construction, Infrastructure - 150,000 SF
Conception
$12,000,000 CJ est. value
Longmont, CO 80501

Watermark Apartments at Longmont
New Construction
Design
Longmont, CO 80501

North Drive Drainage Improvements - Lyons Middle/Senior High School
Infrastructure
Design
$200,000 CJ est. value
Lyons, CO 80540

Southlands Public Infrastructure Improvements
Infrastructure
Bidding
$6,500,000 CJ est. value
Broomfield, CO 80023

2022 Water Main Replacement Project
Infrastructure
Bidding
$3,000,000 CJ est. value
Louisville, CO 80027

Tennis Court Assessment and Repair
Post-Bid
Boulder, CO

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

On-Call Boring and Maintenance Services
Results
Longmont, CO

Basketball Backstop Replacement at Longs Peak Middle School
New Construction
Results
$30,000 to $40,000 est. value
Longmont, CO 80501

Marshall Road and Creek View - Infrastructure
New Construction, Renovation
Construction
Superior, CO 80027

Sundar Apartments - Phase 2
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Lafayette, CO 80026

RFQ Contractor - General Contracting Firms
Renovation, Infrastructure
Bidding
$300,000 CJ est. value
Lyons, CO 80540

Renovation of Park and Open Space Field Office
Renovation
Post-Bid
$80,000 est. value
Superior, CO 80027

Design Build Services for Cottonwood Park Playground Replacement Project
New Construction
Results
Louisville, CO 80027

Last Updated 07/26/2022 03:42 PM
Project Title

RFP D/B - Prescott Wetland Restoration Design - Build Project

Physical Address View project details and contacts
City, State (County) Boulder, CO 80302   (Boulder County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

BACKGROUND: Boulder County Parks and Open Space Department (BCPOS) is seeking proposals for professional design-build contractors to provide all services necessary to restore a montane wetland on the Prescott II property that was ditched historically, leading to draining and drying of hydric soils and long-term impacts to wetland vegetation. The successful contractor will seek out innovative and cost-effective ways to restore the historic hydrology to the site, with minimal impacts to the surrounding vegetation and landscape. The successful bidder will be required to enter into a Contract for Services. Tasks requiring engineering/design reports and/or plans shall be completed and stamped by the appropriately licensed Professional Engineer and/or Landscape Architect. All Engineers and Landscape Architects must be currently licensed with the State of Colorado. All construction must be supervised by a qualified contractor with experience on design build wetland restoration projects. It is anticipated that the initial design work will be completed in 2022, with further design and construction occurring in 2023, likely in September - October when soils are at their driest. The Prescott II property is an undeveloped parcel on County Road 105J (Bunce School Road) and USFS Road 105, accessible from either Peaceful Valley Campground or from State Highway 72 near Allenspark (Location Map, Attachments A and B). The access is very rough and requires high clearance vehicles. The road may require some limited improvements to allow access for necessary equipment and vehicles. PRE-PROPOSAL MEETING: A Pre-proposal meeting will NOT be held for this Project, however, potential proposers are strongly encouraged to walk or drive the potential access routes prior to submitting a proposal. The shortest access road leading to the project site passes through the United States Forest Service's Peaceful Valley Campground, and a weight limited bridge. Beyond this the road is a primitive, narrow, and steep four-wheel drive road requiring a high clearance vehicle. Access can be had from the north on Bunce School Road, but this is a similarly primitive road, narrow, with limited ability to turn a vehicle around and a longer route than the former and is currently blocked by a rockslide. Buyers Requirements General Requirements - Insurance Required Question Acceptance Deadline 08/08/2022 04:00 PM EDT Questions are submitted online No

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents