Similar Projects
High-Capacity, Mobile Stormwater Pumps Project
Infrastructure
Bidding
Southwest Ranches, FL 33331

Transfer Pump Replacement
Post-Bid
Less than $1,735,000 est. value
Hallandale, FL 33009

Submersible Well Pump Motors, Pump Assemblies and Start-Up Services
Term Contract
Post-Bid
FL

Raw Water Well #9
Results
Hallandale, FL 33009

Purchase of a Grundfos Submersible Pump
Results
Davie, FL

Transfer Pump Removal, Repair and Reinstallation
Alteration
Post-Bid
Parkland, FL

Reclaimed Water Treatment Plant (RWTP) - Piping Modification and Production Improvements
Results
Pompano Beach, FL 33062

Mechanical Integrity Testing and Repairs Services for Deep Wells
Term Contract
Results
Sunrise, FL 33351

Mechanical Integrity Testing of the Wastewater Treatment Plant Injection Wells
Results
Less than $120,000 est. value
Pembroke Pines, FL 33027

SBDD Rebuilding of Stormwater Pumps
Results
Southwest Ranches, FL 33331

Fiveash Water Treatment Plant Backwash Pump Conversion
Results
Less than $5,000 est. value
Fort Lauderdale, FL

Submersible Well Pump Motors, Pump Assemblies and Start-Up Services
Term Contract
Results
FL

Regional Wastewater Treatment Plant Injection Well Mechanical Integrity Testing
Results
Plantation, FL

GTL Deepwell Electric Power Instrumentation and Control
Results
Fort Lauderdale, FL

Flygt Pumps Replacement/Repair Services
Results
Miramar, FL

Last Updated 10/27/2021 08:41 AM
Project Title

Floridian Well Water Pump and Motor Combination

Physical Address View project details and contacts
City, State (County) Miramar, FL   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To furnish and deliver a New “14.25-inch Diam 4 Stage VST Pump and Motor Combination” for a groundwater (Floridian Aquifer) well servicing our West Water Treatment Plant. consists of a closed coupled motor and bowl assembly. The pump and motor MUST be completely water lubricated and designed for sustained operation submerged in water.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents