Similar Projects
Park Place Bridgeport Mixed Use / Tualatin
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
King City, OR 97224

Encompass Health Inpatient Rehabilitation Hospital / Hillboro
New Construction, Infrastructure
Conception
$36,000,000 CJ est. value
Hillsboro, OR 97124

Westbrooke Estates Mixed Use
New Construction, Infrastructure - 9,800 SF
Design
$55,000,000 CJ est. value
Hillsboro, OR 97123

Fanno Creek Trail: Woodard Park-Bonita Road/85th Avenue-Tualatin Bridge
Infrastructure
Design
$5,980,000 CJ est. value
Tigard, OR 97223

Rock Creek WRRF Primary Clarifier No. 4 Treatment Expansion
New Construction, Infrastructure, Renovation
Bidding
$18,000,000 CJ est. value
Hillsboro, OR 97123

Frog Pond Primary School
New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Tigard, OR 97223

RFP Engineering - Consulting Services for Design and Implementation Support for the District's Advanced Metering Infrastructure Project
Infrastructure
Post-Bid
$111,000 CJ est. value
Tigard, OR 97223

Beaverton High School Replacement - MEP (Mechanical, Electrical, Plumbing)
Demolition, New Construction, Infrastructure
Post-Bid
$210,800,000 CJ est. value
Beaverton, OR 97005

ASR 3 and 2 Wellhouse Improvements
Renovation, Infrastructure
Results
$4,381,728 CJ est. value
Tigard, OR 97223

Hillsboro High Head Pump Station and Control Gate Modifications
Renovation, Infrastructure
Results
$3,833,000 CJ est. value
Hillsboro, OR 97124

Century Boulevard/TV Highway Intersection #100294 - Washington County
Infrastructure
Construction
$3,691,800 CJ est. value
Hillsboro, OR 97123

Scholls Heights Apartments
New Construction, Infrastructure
Pending Verification
$81,500,000 CJ est. value
Beaverton, OR 97007

Cedarbrook of Tigard Senior Living
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Portland, OR 97223

Hall-Watson Loop Improvements - 5120 - City of Beaverton
Renovation, Infrastructure
Conception
$5,860,000 CJ est. value
Aloha, OR 97007

OR8: SW Hocken Avenue - SW Short Street
Infrastructure
Design
$7,901,395 CJ est. value
Beaverton, OR 97005

Last Updated 03/23/2023 12:50 PM
Project Title

Richard a Miller Armory

Physical Address View project details and contacts
City, State (County) Forest Grove, OR 97116   (Washington County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Military Facility, Site Development
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $120,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

For Richard a Miller Armory THE PROJECT INCLUDES BUT IS NOT LIMITED TO THE REMOVAL AND REPLACEMENT OF APPROXIMATELY 1,680 SQUARE FEET OF EXISTING TWO-INCH STANDING SEAM METAL ROOF WITH 180 DEGREE MECHANICALLY SEAMED JOINTS, BUTYL INJECTED SEAL, 24 GAGE, TAYLOR METAL PRODUCTS MS200 OR APPROVED EQUAL, COLOR TO MATCH ADJACENT ARMORY BUILDING, INSTALLED PER MANUFACTURER'S SPECIFICATIONS FOR LOW SLOPE ROOFS. SCOPE OF WORK WILL INCLUDE INSULATION, FLASHINGS, PARAPET COVERINGS, GUTTERS AND DOWN SPOUTS FOR THE ENTIRE ROOF SYSTEM FOR BUILDING 1002 AT THE FOREST GROVE ARMORY. THIS IS AN OREGON PREVAILING WAGE RATE (BOLI REQUIREMENTS) PROJECT.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents