Similar Projects
Sinkholes Remediation
Infrastructure
Bidding
$250,000 to $500,000 est. value
Bella Villa, MO 63125

Fee Fee Road Ballfields Culvert Replacement
Infrastructure
Bidding
Maryland Heights, MO

Forest Park Waterway
Post-Bid
$7,102,880 est. value
Saint Louis, MO 63110

Harrison County Courthouse Landscape and Drainage Improvements
Post-Bid
Bethany, MO 64424

Elson Street Culvert Replacement
Results
Kirksville, MO

Corby Pond Restoration
Results
Saint Joseph, MO 64506

Creek Corridor Stewardship Maintenance
Infrastructure
Bidding
Saint Peters, MO

Clean and Shape Ditches
Alteration
Post-Bid
Martinsburg, MO

Deer Creek Flood Mitigation Phase 2
Results
Brentwood, MO

Small Structure Replacement Program
Infrastructure
Bidding
MO

Elementary Library Drainage
Infrastructure
Post-Bid
Iberia, MO

West Hangar Drainage Improvements
Results
Chesterfield, MO 63005

Culvert Pipe
Infrastructure
Bidding
Saint Joseph, MO

Parking Lot Regrading and Drainage Project
Infrastructure
Post-Bid
Gower, MO

Paddock Creek Improved Channel Repair
Results
$597,000 est. value
Chesterfield, MO

Reported 03/21/2022 04:01 AM
Project Title

Shelby County Route N Drainage Project

Physical Address View project details and contacts
City, State (County) MO   (Shelby County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Shelby County Route N is a state-maintained route that runs North/South from Route K to US 36. On the north side of the North Fork Salt River Bridge, approximately 3.5 miles north of US 36, the river bottom is holding water which keeps Route N closed for long periods of time. The water retention is cause by wildlife and sedimentation blocking drainage structures off the Route N right of way Installation of a riser and drainage pipe to drain water from highway right of way into the North Fork Salt River to lower the water level below the travel surface of Route N.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents