Similar Projects
Dexter-Chelsea Road Trail Connector - City of Dexter
Infrastructure
Conception
$1,500,000 est. value
Dexter, MI

Dan Hoey Road Sidewalk - City of Dexter
Infrastructure
Conception
Dexter, MI 48130

Hot Mix Asphalt Resurfacing, Water Main, Concrete Sidewalk, Drainage and Pavement Markings on Platt Road
Infrastructure
Bidding
$2,337,000 est. value
Ann Arbor, MI 48106

Street Preventative Maintenance Project - FY 2023
Infrastructure
Bidding
Ann Arbor, MI

Paving & Site Lighting
Post-Bid

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

2020 Riveroaks-Keveling Paving Project
Results
Less than $294,535 est. value
Saline, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Costco: Off-Site Parking Lot
New Construction
Construction
$10,000,000 CJ est. value
Ann Arbor, MI 48108

2.95 MI of High Friction Surface Treatment, Signing
Infrastructure
Post-Bid
MI

Hot Mix Asphalt (HMA) Countywide Resurfacing Program
Results
Ann Arbor, MI

1.19 MI of Hot Mix Asphalt Cold Milling and Resurfacing, Detail 7 Joint and Crack Repairs, Sidewalk Ramps, Signal Detection and Pavement Markings on US-12 from Maple Road easterly to Industrial Drive
Infrastructure
Post-Bid
MI

5.49 MI of Hot Mix Asphalt Cold Milling and Resurfacing, Bridge Rehabilitation and Pavement Markings
Results
MI

Ypsilanti Community Schools Asphalt Replacement
Infrastructure
Post-Bid
Ypsilanti, MI

0.65 MI of Hot Mix Asphalt Shared Use Path, Concrete Curb and Gutter, Sidewalk, Sidewalk Ramp, Culvert, Sewer, Drainage, Pavement Markings
Results
MI

Last Updated 06/13/2022 10:05 AM
Project Title

Baker Road Crosswalk at Forest - City of Dexter

Physical Address View project details and contacts
City, State (County) Dexter, MI 48130   (Washtenaw County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2024
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Dexter, Michigan. Conceptual plans call for site work for a road / highway; and for paving for a road / highway. Addition of a pedestrian crosswalk. Offset alignment of Forest onto Baker requires engineering design for crosswalk placement. As of June 10, 2022, this project is included in the City of Dexter's FY 2022-2026 CIP. Information regarding a design firm and the general contractor selection timeline has not been disclosed. Although a firm timeline for construction has not been determined, funding is not scheduled prior to fiscal year 2024. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents