Project Title | Pavement Resurfacing at Various Locations |
Physical Address | View project details and contacts |
City, State (County) | Baltimore, MD 21202 (Baltimore City County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Results, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $3,909,848 [brand] Estimate |
Plans Available from | Agency's Affiliate - 09/09/22 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For Pavement Resurfacing at Various Locations Conditions and requirements of the Bid are found in the bid package. All contractors bidding on this Contract must first be prequalified by the City of Baltimore Contractors Qualification Committee. Interested parties should call (410) 396-6883 or contact OBC at 4 S Frederick St., 4th Floor, Baltimore, MD 21202. If a bid is submitted by a joint venture (Jv), then in that event, the document that established the JV shall be submitted with the bid for verification purposes. The Prequalification Category required for bidding on this project is A02602 - Bituminous Concrete Paving. Cost Qualification Range for this work shall be $5,000,000.01 to $10,000,000.00. Contractors questions shall be submitted via email to lwalston@baltimorecity.gov by September 21, 2022 at 4:30 PM. Questions submitted after the deadline may not be responded to and contractors will be required to submit their bids based on the available information. For further inquiries about purchasing bid documents, please contact the assigned Contract Administrator Latonia.Walston@baltimorecity.gov and dpwbidopportunities@baltimorecity.gov. Principal items of work for this contract include, but are not limited to: Work primarily includes milling and resurfacing, installation of pavement markings, in Baltimore City streets and roadways When directed by the Engineer, additional work may include asphalt surface/base course placement, reinforced concrete pavement replacement, non-reinforced rigid base replacement, at various locations. The MBE goal is 16% The WBE goal is 7% *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |