Similar Projects
Reported | 02/01/2022 02:44 PM |
Project Title | 5 Black Top Patching Areas |
Physical Address | View project details and contacts |
City, State (County) | New Auburn, WI (Chippewa County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | No Responses Submitted |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Location and specifications include: • Location 1-117th St (Round Lake Road) Near intersection of 298th Ave (Ferndale Road). Twenty (20’) foot wide and ten (10’) length. • Location 2: 117th St. (Round Lake Road) near Arrowhead Bible Camp. Twenty (20’) foot wide and ten (10’) foot length. • Location 3: 138th St. (Chippewa Trail) 1/10th of a mile east of 136th St. Twenty (20’) foot wide and 10 (10’) foot length. • Location 4: 167th St (Plummer Lake Road) 2 miles south of Cty Hwy M. Eighteen (18’) foot wide and ten (10’) foot length. • Location 5: 100th St (East Axhandle Road). North end driveway, bump out to be saw cut and remove old and replace with new blacktop |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |