Similar Projects
2022-2023 Street Improvements - Phase 1
Term Contract, Infrastructure
Bidding
Bloomer, WI

125th Avenue, STH 124 to STH 178, LRIP TRID Project
Infrastructure
Bidding
Chippewa Falls, WI 54729

2021 LRIP Road Improvements
Post-Bid
New Auburn, WI 54757

Lift to Road
Infrastructure
Post-Bid
Bloomer, WI

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

ATV / UTV Trail Construction
New Construction
Results
Lake Wissota, WI 54729

Asphalt Paving Maintenance
Term Contract, Infrastructure
Bidding

Culvert Installation
Infrastructure
Post-Bid
WI 54724

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Road Work
Infrastructure
Post-Bid
Bloomer, WI 54724

Anson 105th Avenue Resurfacing
Results
Jim Falls, WI

Crack Sealing
Infrastructure
Post-Bid
Bloomer, WI 54724

C. Chippewa Falls, Seymour Cray SR Blvd., CTH I Intersection
Results
Chippewa Falls, Seymour, WI

Spring and River Street Utility and Street Improvement
Results
Chippewa Falls, WI 54729

Cedar Street Utility and Street Improvement
Results
Chippewa Falls, WI 54729

Reported 02/01/2022 02:44 PM
Project Title

5 Black Top Patching Areas

Physical Address View project details and contacts
City, State (County) New Auburn, WI   (Chippewa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Location and specifications include: • Location 1-117th St (Round Lake Road) Near intersection of 298th Ave (Ferndale Road). Twenty (20’) foot wide and ten (10’) length. • Location 2: 117th St. (Round Lake Road) near Arrowhead Bible Camp. Twenty (20’) foot wide and ten (10’) foot length. • Location 3: 138th St. (Chippewa Trail) 1/10th of a mile east of 136th St. Twenty (20’) foot wide and 10 (10’) foot length. • Location 4: 167th St (Plummer Lake Road) 2 miles south of Cty Hwy M. Eighteen (18’) foot wide and ten (10’) foot length. • Location 5: 100th St (East Axhandle Road). North end driveway, bump out to be saw cut and remove old and replace with new blacktop

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents