Similar Projects
East Selmon Expressway Slip Ramps Design-Build
Bidding
Tampa, FL

Douglas Avenue Crosswalk
Bidding
Dunedin, FL 34698

Widen/Resurface Exist Lanes/Sidewalk/Bicycle Lanes
Post-Bid
Less than $1,378,994 est. value
FL

Harvest Center Sidewalk Improvements
Post-Bid
Homestead, FL

Sidewalk Restoration Services
Term Contract
Results
Miramar, FL

Six Mile Cypress Shared use Path from Winkler Avenue to Challenger Boulevard
Results
Less than $145,666 est. value
Fort Myers, FL 33901

Bypass Drive Improvements
Bidding
$1,500,000 est. value
Clearwater, FL 33764

Douglas Bldg. ADA Upgrades- Parking
Post-Bid
Tallahassee, FL 32399

Parking Lot Resealing at Trails and Tails Park and Veterans Park
Results
Less than $22,000 est. value
Doral, FL 33178

Stunson Nature Trail - Planting Buffer and Viewing Platform
Bidding
Oakland Park, FL 33309

Public Private Partnership Redevelopment Opportunity for the Hollywood Beach Culture and Community Center
New Construction - 20,000 SF
Post-Bid
Hollywood, FL 33019

Myrtle Street Improvements, Phase 3
Results
Less than $2,536,473 est. value
Sarasota, FL 34234

Street Resurfacing and Miscellaneous Roadway Improvements
Term Contract
Bidding
$650,000 est. value
Jupiter, FL

Annual Concrete Sidewalk, Driveway, Curb, and Gutter Repairs
Term Contract
Post-Bid
Fort Myers, FL 33901

Oars and Paddles Park, Parking Lot Expansion
Results
Indian Harbour Beach, FL 32937

Last Updated 03/18/2021 10:23 AM
Project Title

Country Club Subdivision Sidewalk Improvements

Physical Address View project details and contacts
City, State (County) Sanford, FL 32771   (Seminole County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $430,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

A. The Project includes sidewalk improvements in the Country Club Subdivision for approximately 5,000 linear feet along the western Right-of-Way of Hays Drive, along the northern Right-of-Way of Mayfair Circle to Country Club Drive, along the western Right-of-Way on Club Road from Mayfair Circle to W 25th Street, and along the eastern Right-of-Way on Bradshaw Drive from Mayfair Circle to W 25th Street. The Work includes new sidewalk, new driveway aprons, curb and gutter, curb ramps, and painted pavement markings. B. Furnish all materials, equipment, tools, and labor which is reasonably and properly inferable and necessary for the proper completion of the Work, whether specifically indicated in the Contract Documents or not. C. All fees and permits for the permanent construction that are required by controlling agencies or authorities, including fees for the review of Contract Documents prior to construction, will be procured by the Owner. Other licenses or permits for construction facilities of a temporary nature that are necessary for the prosecution of the work shall be secured and paid for by the Contractor. D. Repair, replace, or otherwise settle with the Owner, if damage to property or existing facilities occurs, including damage to pavements, utilities, lawns, structures, etc. E. Construct the Project under a single unit contract.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents