Similar Projects
SR 19 Br/Otter Ck Trib 3
Infrastructure
Conception
$675,000 CJ est. value
Mercer, PA 16137

SR 518: SR 18 to Division Street
Infrastructure
Conception
$2,653,000 CJ est. value
Hermitage, PA 16148

SR 2002: Neshannock Creek Bridge
New Construction, Demolition, Infrastructure, Alteration
Design
$40,000 est. value
PA

Ohl Street Bridge
Demolition, New Construction, Infrastructure
Design
$994,593 CJ est. value
Greenville, PA 16125

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Waterline Replacement Projects - Group 1
Infrastructure
Results
$2,123,000 est. value
Greenville, PA 16125

Lead Service Replacement Project
Infrastructure
Results
$264,000 est. value
Greenville, PA

Waterline Replacement Projects - Group 2
Infrastructure
Construction
$734,995 CJ est. value
Greenville, PA 16125

Waterline Replacement Projects - Group 2
Infrastructure
Construction
$734,995 CJ est. value
Greenville, PA 16125

O'Reilly Auto Parts / Grove City
New Construction, Infrastructure
Conception
$750,000 CJ est. value
Grove City, PA 16127

PA 173 - Vath Road - SR 1004
Infrastructure
Design
$514,000 CJ est. value
Jackson Center, PA 16133

Grove City Airport Contract No.14 - Construct Hangar Site Preparation and Parking Lot Relocation
Infrastructure
Results
$1,000,000 est. value
Mercer, PA 16137

Millbrook Road Bridge over I-79
Infrastructure, Renovation
Design
$710,000 CJ est. value
Mercer, PA 16137

Waterline Replacement Project
Infrastructure
Results
$2,179,085 CJ est. value
Greenville, PA 16125

PA 258 Bridge / Magargee Run
Infrastructure, Renovation
Design
$1,310,000 CJ est. value
Mercer, PA 16137

Last Updated 08/25/2022 11:31 AM
Project Title

Bobby Run Stream Rehabilitation Contract #2

Physical Address View project details and contacts
City, State (County) Hermitage, PA 16148   (Mercer County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $67,954 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 25, 2022, project was awarded to Meadville Land Service Inc. , awarded amount is $67, 953.75.** Contractors must meet minimum qualifications to submit bids for this project. Contact the phone number or email above to receive the qualification requirements statement. Each bid shall be accompanied by a Certified Check or Bid Bond in the amount of not less than 10% of the total bid. A 100% Performance & Payment Bond is required for this work. The City reserves the right to waive any defects, errors, omissions, mistakes, informalities, to accept any bid or combination of bids that are deemed to be in the best interest of the City, and to reject any or all proposals.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents