Similar Projects
Jerusalem Hill Road Winter Maintenance for the 2019-2020 Season
Term Contract
Post-Bid
Beaver, PA

Snow Removal and Salting of Borough Streets
Post-Bid
Langhorne, PA

Garage Maintenance Project
Results
State College, PA

Equipment Rental Road Maintenance
Results
Pocono Pines, PA 18350

Snow Plowing Services
Post-Bid
Pittsburgh, PA 15123

Snow Plowing Services
Term Contract
Results
Middletown, PA 17057

Snow Plowing Service
Term Contract
Post-Bid
Farrell, Greenville, Hermitage, Mercer, Sharon, Sharpsville, PA

2020 District Wide Bridge Cleaning
Results
$500,000 to $999,999 est. value

Snow Removal and Salt Spreading
Post-Bid
Ohiopyle, PA

MS4 Street Sweeping and Recording Services
Results
Mechanicsburg, PA 17055

2019-20 Snow Plowing/Snow Removal
Post-Bid
Arona, PA 15617

Bridge Wash 2020
Results
$1,000,000 to $2,499,999 est. value

Snowplowing Services
Post-Bid
Quarryville, PA

Bridge Bearing Cleaning
Results
$100,000 to $199,999 est. value

Snow Plow Bids
Post-Bid
Duryea, PA 18642

Reported 05/07/2020 12:00 AM
Project Title

2020 Street Sweeping

Physical Address View project details and contacts
City, State (County) Exton, West Chester, PA 19341   (Chester County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 04/22/20
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall include, but not necessarily be limited to furnishing equipment and labor for street sweeping and removal of debris for approximately sixty-six miles (roughly 132 lane miles) of Township owned and maintained streets and roadways. The term “street” shall include the paved area between the normal curb lines of the roadway, whether or not an actual curb exists. The work also includes sweeping the following paved areas: 1. Township Building, 101 Commerce Drive 2. Parking lot of Miller Park, 220 Miller Way 3. Driveway and parking lot of Boot Road Park, 110 West Boot Road, West Chester, Pa All deposits of dirt, rock, gravel, leaves, sticks, paper, cans and other miscellaneous items within the areas to be swept and of a size which can be practically removed by sweeping operations shall be removed in accordance with all regulatory agency requirements. Water can be obtained through a high volume water line located in the Public Works Garage, 222 North Pottstown Pike, Exton, Pa.

Details

Division 01 - General Requirements, Cleaning and Waste Management.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents