Similar Projects
Bob Bailey Senior Wellness Center Rebid
New Construction, Infrastructure - 3,500 SF
Results
$2,338,000 CJ est. value
Huntington, WV 25701

Latrobe Street Mission Renovations Phase 1
Build-out
Design
$500,000 CJ est. value
Parkersburg, WV 26101

Latrobe Street Mission Phase 2
Addition
Design
$500,000 CJ est. value
Parkersburg, WV 26101

Last Updated 06/29/2023 11:03 PM
Project Title

Weirton Senior Center HVAC Renovations

Physical Address View project details and contacts
City, State (County) Weirton, WV 26062   (Hancock County)
Category(s) Residential
Sub-Category(s) Assisted Living Facility
Contracting Method Bids by Invitation
Project Status Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $503,245 [brand] Estimate
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

After opening, the bids will be compared as to quality, thoroughness, and cost by the Owner and its Architect (McKinley Architecture and Engineering). The work in general consists of Air Handling Equipment & Boiler Replacements at the Greater Weirton Senior Center. Only full sets of the Bidding Documents will be issued by the Architect. With payment of the $50.00 document access fee, the interested party will also be listed by the Architect as a registered bidding document holder. All Bidding Document requests for information, substitution requests and correspondence shall be submitted in writing and directed to the Architect s administrative account, email projects@mckinleydelivers.com. Addenda will be issued by the Architect to registered bidding document holders only, who will automatically receive all addenda in electronic format (PDF) via file transfer email. Additional reproduced paper copies of the initially issued Bidding Documents and any subsequent addenda are also available from the Architect upon request by registered bidding document holders only, and upon payment of a non-refundable cost; contact the Architect for further information. A Bid Bond executed by the Bidder and issued by a surety company approved by and in favor of the Owner, in the amount equal to five percent (5%) of the Bid, shall be submitted with each Bid, to guarantee the Bidder s entrance into a Contract, if given the award. No accepted Bid shall be waived or returned because the Bidder failed to or cannot comply with all requirements as set forth in Bidding Documents. Further, the successful bidder will be required to furnish and pay for a satisfactory 100% Performance and Labor and Material Payment Bond in the amount of the contract price. Bids may not be withdrawn for a period of ninety (90) days without the consent of the Owner. All Bidders and sub-bidder(s) as Contractor and Subcontractor(s) are required to utilize local labor pursuant to Chapter 21-Article 1C, the West Virginia Jobs Act. Pursuant to Chapter 21-Article 11 of the West Virginia Contractor Licensing Act of 1991, all Contractors doing business in West Virginia must be licensed to perform work in the State; the Contractor s WV License number must be affixed to all submitted construction bids and fully executed and binding construction contracts or agreements. The work of the project is partially funded by Federal Grant and as such is subject to compliance with the following Federal requirements as further stipulated in the Bidding Documents: 1) Davis Bacon Act. (40 U.S.C. 3141 3144, and 3146 3148); 2) The Equal opportunity clause provided under 41 CFR 60 1.4(b), contractors will not discriminate against any employee or applicant for employment because of race, color, religion, sex, sexual orientation, gender identity, or national origin. The contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, religion, sex, sexual orientation, gender identity, or national origin; 3) The Contract Work Hours and Safety Standards Act (40 U.S.C. 3701 3708); the Clean Air Act (42 U.S.C. 7401 7671Q); the Federal Water Pollution Control Act (33 U.S.C. 1251 1387); Byrd Anti Lobbying Amendment (31 U.S.C. 1352); and section 6002 of the Solid Waste Disposal Act; and 4) As appropriate and consistent with law and to the greatest extent possible the Domestic Preferences for Procurements (2 Cfr Section 200.323) and Small and Minority Businesses, Women's Business Enterprises, and Labor Surplus Area Firms (2 Cfr Section 200.321) are preferred; 5) Contract award (see 2 CFR 180.220) will not be made to parties listed on the government wide exclusions in the System for Award Management (SAM). To the extent permitted by state law, the Owner reserves the right to reject any and all bids, and to make selections from the bids that are solely in its own best interest. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents