Similar Projects
Reported | 06/02/2020 12:00 AM |
Project Title | Districtwide Elevator Rehabilitation 20.439 |
Physical Address | View project details and contacts |
City, State (County) | El Paso, TX 79904 (El Paso County) |
Category(s) | Education |
Sub-Category(s) | Middle/Senior High School |
Contracting Method | Competitive Bids. |
Project Status | Request for Quotations |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Five Elevators and Elevator machine rooms as follows: 1. Andress H.S. Science Building, Hydraulic Elevator: Dover, Passenger Elevator, Model No. DMC-1A, Capacity 2,000 pounds, Speed 100 ft/min, Two floors. 2. Canyon Hills M.S., Main Building, Hydraulic Elevator: Dover, Passenger Elevator, Model No. DMC-1A, Capacity 2,000 pounds, Speed 100 ft/min., Two floors. 3. Canyon Hills, Wing B, Hydraulic Elevator: Dover, Passenger Elevator Model No. DMC-1A, Capacity 2,000 pounds, Speed 100 ft/min., Two Floors. 4. CCTE Main Building, Hydraulic Elevator: Otis Elevator Company, Passenger Elevator, Model No. LRV11, Capacity 2,100 pounds, Speed 100 ft/min., Three floors. 5. Coldwell E.S., Main Building, Hydraulic Elevator: Dover, Solid State, Capacity 2,100, Speed 100 ft/min., Two Floors. - New Submersible Pump Units: Units shall include a sealed 12 gage steel Tank with Tank Heater, Pump, Motor, Control Valve, Drip Pan, Silencer, Plunger, Valves, temperature sensor and hydraulic elevator oil. - New Hydraulic Traction Controller. Controller station shall include LCD display panel, pre-wired box, emergency lighting, voice annunciator system and NEMA 1 cabinet. - New Hall Call button panel: Panel to include Display and Vandal push buttons. - New Door Operators: New operators to include safety circuits matched to traction controller. - New Door Rollers. - New Traveler Cable: New cable rating of 15 years or greater. - New minimum 5,000 BTU coolers to be installed in each machine room (5) and vented outside. - Remove existing flooring and install new speckled Artic White 0190 vinyl composite tile (VCT) flooring with Vinyl Wall Base. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |