Similar Projects
Douglas Avenue Crosswalk
Bidding
Dunedin, FL 34698

Bypass Drive Improvements
Bidding
$1,500,000 est. value
Clearwater, FL 33764

District Seven FCO Structures and Sidewalk Project
Post-Bid
Less than $261,000 est. value
Clearwater, FL 33760

Concrete, Brick and Mortar Repair and Replacement
Term Contract
Post-Bid
Saint Pete Beach, FL 33706

West Bay Drive/Pinellas Trail Gateway
Results
Less than $1,802,333 est. value
Largo, FL

Sidewalk Hercules Avenue Phase II From Sherwood Street to Sunset Point Road
Results
Clearwater, FL 33756

46th Avenue Recreational Trail
Post-Bid
$561,393 to $562,923 est. value
Kenneth City, FL

62nd Avenue Sidewalk and Intersection Improvement Project
Results
Less than $1,753,002 est. value
Clearwater, FL 33755

Saratoga Apartments Outer Parking Lots Renovations
Post-Bid
Saint Petersburg, FL 33713

FY 2020 – FY 2022 Countywide ADA, Sidewalk, Drainage, Roadway Improvements (Pid # 004184A)
Results
$14,254,223 est. value
Clearwater, FL 33755

St. Petersburg College Board of Trustees Clearwater Campus Parking Lot Repairs
Post-Bid
Clearwater, FL 33755

Parking Lot, Bus Loop and Associated Drainage Installed
Results
Less than $150,000 est. value
Dunedin, FL 34698

FY21-23 Sidewalk and Underdrain Replacement
Post-Bid
Less than $4,300,000 est. value
Pinellas Park, Saint Petersburg, Seminole, FL 33702

Alt US 19 / SR 595 at Wilson Street Pedestrian Crosswalk
Results
Less than $80,000 est. value
Dunedin, FL 34698

Parking Lot and Site Lighting Renovations
Post-Bid
Largo, FL 33773

Last Updated 03/03/2020 02:27 PM
Project Title

Sunset Point Sidewalk - Alternate 19 to Pinellas Trail PID 002926A

Physical Address View project details and contacts
City, State (County) Clearwater, FL 33755   (Pinellas County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $581,812
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Pinellas County - Work consists of providing pedestrians with a safe route from Alt 19 to the Pinellas Trail and a continuous sidewalk along Sunset Point Road with minor road improvements. BCC requested this project to connect Alt 19 with existing sidewalk along Sunset Point Road City of Clearwater - The scope of work is to provide utility relocation and adjustments associated with the relocations of potable water mains, reclaim water mains and gravity sanitary sewer mains owned by City of Clearwater (City) as shown in the JPA design plans. Work includes relocation of a 6” water main, two (2) fire hydrants, eighteen (18) water meters, two (2) valve boxes, a 4” reclaimed water line, two (2) 6” sanitary sewer laterals (including cleanout), and two (2) sanitary sewer cleanouts that are in conflict with the County’s proposed drainage structures and sidewalk construction improvements at the project location on Sunset Point Road from Edgewater Boulevard (U.S. Alternate 19) and the Pinellas Trail.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents