Similar Projects
Tasker Retaining Wall Replacement
Infrastructure
Design
$798,863 CJ est. value
Storrs Mansfield, CT 06269

Tolland Fire Department Replacement of Stations - 440
Demolition, New Construction, Infrastructure - 4,600 SF
Design
$5,000,000 CJ est. value
Tolland, CT 06084

Gilbert Road Site Preparation
Renovation, Infrastructure
Bidding
$4,700,000 CJ est. value
Storrs Mansfield, CT 06269

Fenton River Well Field and Road
Infrastructure
Bidding
$550,000 est. value
Mansfield, CT

Horse Barn Hill - Bioscience - Horizontal Cabling (Phase 2)
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Storrs Mansfield, CT 06269

On-Call Supplemental Asphalt Contractor Services Set-Aside Program for Projects Under $100K
Term Contract
Post-Bid
$100,000 est. value
Storrs, CT 06269

NER and Discovery Drive Intersection Improvements
Post-Bid
Storrs, CT

Intersection Improvements at Swamp Road and Boston Turnpike
Infrastructure
Results
Coventry, CT 06238

CT Route 89 and CT Route 195 Intersection Improvements
Infrastructure
Results
$397,340 est. value
Mansfield, CT 06250

Galvanized Stairs and Fences, Mansfield Hollow Dam, Mansfield Ctr, CT
Infrastructure
Design
$100,000 CJ est. value
Mansfield Center, CT 06250

Kindercare Learning Facility
New Construction, Infrastructure - 10,000 SF
Bidding
$3,000,000 CJ est. value
Vernon Rockvl, CT 06066

Snow and Ice Control Services at Rental Houses
Term Contract
Post-Bid
Storrs, CT

Preservation Program Ultra-Thin Bonded PMA
Infrastructure
Results
$1,000,000 to $2,499,999 est. value
Newington, Tolland, Wethersfield, Willington, CT

Sluice Gate Actuator and Stem Replacement
Infrastructure
Design
$100,000 CJ est. value
Storrs Mansfield, CT 06268

Softball Field No.1 at Miller Richardson Park
Demolition, Infrastructure
Bidding
$300,000 CJ est. value
Coventry, CT 06238

Last Updated 08/04/2022 05:06 PM
Project Title

Long Hill Road and Shoddy Mill Road

Physical Address View project details and contacts
City, State (County) Andover, CT 06232   (Tolland County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $378,244 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reclaim and Repave in Andover CT 1. Shoddy Mill Road from Route 6 to 260 ft past the Intersection of Wales Road 2. Long Hill Road from route 6 to 140 ft past the intersection of Bear Swamp Road

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents