Similar Projects
Hydraulic Pump Replacement
Infrastructure
Results
Little Rock, AR

W3 Pump Replacement
Infrastructure
Bidding
Fayetteville, AR

Lawson-Urbana Well No 4 Contract I - 400-GPM Well
Results
El Dorado, AR

Wastewater System Improvements - Contract Section I (Collection System)
New Construction, Infrastructure
Post-Bid
Alpena, AR

Clarifier Scum Pump Replacement
Results
Fayetteville, AR 72701

60 HP Submersible Pump
Infrastructure
Post-Bid
Benton, AR

Reported 07/30/2021 12:00 AM
Project Title

Construction of Filters 13 and 14

Physical Address View project details and contacts
City, State (County) Greers Ferry, AR 72067   (Cleburne County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of constructing two dual media filters, refurbishment of two filter galleries, replacement of filter media in 11 filters, and the remodel of the laboratory and locker room.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents