Similar Projects
RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Paving
Infrastructure
Results
$200,000 est. value
Highgate, VT

Burton Island State Park Toilet Building Renovation and New Shower Buildings
New Construction, Infrastructure, Renovation
Results
$1,760,000 CJ est. value
Saint Albans, VT 05478

Fairfield Street Emergency Department Expansion
Addition, Infrastructure, Renovation - 11,676 SF
Pending Verification
$11,000,000 CJ est. value
Saint Albans, VT 05478

Fairfield Street Emergency Department Expansion
Addition, Infrastructure, Renovation - 11,676 SF
Pending Verification
$11,000,000 CJ est. value
Saint Albans, VT 05478

Missisquoi Valley Rail Trail Concrete Slabs and Relocation of a Kiosk
Infrastructure
Post-Bid
$400,000 CJ est. value
Saint Albans, VT 05478

Fairfax-St. Albans STP FPAV(66)
Infrastructure
Results
$4,112,050 CJ est. value
Saint Albans, VT 05478

Nucar Automall of Saint Albans Expansion
New Construction, Infrastructure - 50,000 SF
Pending Verification
$13,200,000 CJ est. value
Saint Albans, VT 05478

Sandy Bay / Black Woods Road Drainage Improvements
Infrastructure
Post-Bid
$15,000 CJ est. value
Franklin, VT 05457

Church Street Sewer Improvements
Infrastructure
Results
$349,455 CJ est. value
Enosburg Fls, VT 05450

Bellows Free Academy (BFA Fairfax) - 2022 Bond - Franklin West Supervisory Union
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$36,500,000 CJ est. value
Fairfax, VT 05454

Swanton Bridge 6 Joint Rehabilitation
Infrastructure
Post-Bid
$250,000 CJ est. value
Swanton, VT 05488

Route 7 Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Swanton, VT 05488

RFP Engineering - Swanton Sidewalk to Missisquoi Valley Union High School
Infrastructure
Post-Bid
$200,000 CJ est. value
Swanton, VT 05488

Last Updated 10/16/2023 03:10 AM
Project Title

St. Albans-Sheldon Stp 2941(1)

Physical Address View project details and contacts
City, State (County) Saint Albans, VT 05478   (Franklin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $3,761,284 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work to Be Performed Under This Project Includes Coarse-milling And Paving of the Existing Highway, Pavement Markings, Guardrail, Signal Work, Signs and Other Related Highway Items Location: Beginning in St. Albans on Vt Route 105 at Station 0+18.00 (Mm 0.003) and Extending Easterly Along Vt Route 105 for a Distance of Approximately 40,710.00 Feet (7.710 Miles) to Station H 105+75.00 (Mm 2.003) Ending in the Town of Sheldon. Beginning in St. Albans on Sheldon Rd at Station 501+47.00 (Mm 0.028) and Extending Northerly Along Sheldon Rd for a Distance of Approximately 1,093.00 Feet (0.207 Miles) to Station 512+40.00 (Mm 0.235) Ending in the Town of St. Albans Bid Bond: Electronic bid bond to be submitted in the amount of 5% of the Contractor's bid. All Bidders on This Project Must Hold Both Current Annual Prequalification With the Vermont Agency of Transportation Through the Contractor's Experience Questionnaire and Financial Statement And Unconditioned Project-specific Approval Through the "Standard Form - Request for Proposal" Ca-82 Form During the advertisement period, all questions shall be addressed solely to the Office of Contract Administration via email: AOT.ConstructionContractingInquiry@vermont.gov All inquiries must be received by 4:30pm on Wednesday, September 27, 2023. For this proposal the Engineer's Estimate is Category E.( $2,500,000 - $5,000,000 ) This Contract shall be completed on or before October 11, 2024. The right is reserved to reject any or all bids, to waive any formality, and any and all technicalities in bids, and to accept such bids as may be deemed in the best interest of the awarding agency. VT DOT - St. Albans-Sheldon Stp 2941(1) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents