Similar Projects
The Lofts at Novotny
New Construction, Infrastructure - 73,000 SF
Design
$24,000,000 CJ est. value
Baxter, MN 56425

New Town Hall
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Deerwood, MN 56444

Road Work in Crow Wing Township 2023
Infrastructure
Bidding
$500,000 CJ est. value
Brainerd, MN 56401

2019 Referendum - Phase 4 Summer 2023 Projects Cuyuna Range Elementary School
Renovation, Infrastructure - 23,284 SF
Sub-Bidding
$1,000,000 CJ est. value
Crosby, MN 56441

Truck Storage Building
New Construction
Post-Bid
$400,000 est. value
Merrifield, MN 56465

2023 Cypress Drive and Douglas Fir Drive Improvements
Infrastructure
Post-Bid
$200,000 CJ est. value
Baxter, MN 56425

Aircraft Rescue and Firefighting (ARFF) and Snow Removal Equipment (SRE) Facility
New Construction - 39,000 SF
Results
$10,000,000 est. value
Brainerd, MN 56401

New Water Treatment Plant
New Construction, Infrastructure
Results
$5,206,300 CJ est. value
Ironton, MN 56455

Pinehurst Apartments
New Construction, Infrastructure
Pending Verification
$109,000,000 CJ est. value
Baxter, MN 56425

2023 Plott Road, Woodland Drive, and Woodland Beach Road Improvement Bid
Infrastructure
Bidding
$500,000 CJ est. value
Deerwood, MN 56444

Grading, Bituminous Surfacing, ADA Improvements, and Bridge No. 18010
Infrastructure
Results
$6,369,067 CJ est. value
Brainerd, MN 56401

Construct Conventional Hangar
New Construction, Infrastructure
Bidding
$4,500,000 CJ est. value
Brainerd, MN 56401

T.H. 210/Inglewood Drive and T.H. 210/Knollwood Drive Improvements Project
Infrastructure
Results
$2,127,824 CJ est. value
Baxter, MN 56425

Bituminous Crack Sealing 2
Infrastructure
Bidding
$300,000 CJ est. value
Breezy Point, MN 56472

Bituminous Crack Sealing Maintenance 1
Infrastructure
Bidding
$300,000 CJ est. value
Brainerd, MN 56401

Last Updated 02/13/2023 10:30 AM
Project Title

Bruce Clark Storage Facility

Physical Address View project details and contacts
City, State (County) Brainerd, MN 56401   (Crow Wing County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of 2 cold storage buildings with a total of 18 storage units. As of February 13, 2023, this project is in the early planning stages. It will be reviewed by the Brainerd Planning Commission on February 15, 2023. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been announced, however, construction is unlikely to begin prior to third quarter of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

10,400 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents