Similar Projects
Z--Construction IDIQ 2020 - Ohio - MEP
Design
$20,000 to $16,000,000 est. value
Chillicothe, Cleveland, OH

Z--Construction IDIQ 2020 - Ohio - MEP
Design
$20,000 to $16,000,000 est. value
Chillicothe, Cleveland, OH

Capital Improvements - Bid Package 4
Alteration
Bidding
$883,452 est. value
Fremont, OH 43420

Air Cooled Screw Chiller Replacement
Alteration
Bidding
Zanesville, OH

Water Meter Back Flow Preventer
Post-Bid
Less than $1,380,000 est. value
Columbus, OH

Mechanical Maintenance needs for Various Stark County Buildings
Post-Bid
Canton, OH 44702

Y--1B229 Mechanical Room (VA-19-00027342)
Results
$250,000 to $500,000 est. value
Cleveland, OH 44106

J--Cooling Towers - Refurbish/Repair
Results
Columbus, OH 43219

Navin Elementary School Boiler Replacement
Alteration
Bidding
$250,000 est. value
Marysville, OH 43040

Vacuum Booster Pump Maintenance
Post-Bid
Sandusky, OH

Replace Fan Coil Units Building 7 Sinclair Community College
Results
$200,000 est. value
Dayton, OH

Temporary Boiler 2022
Alteration
Bidding
Athens, OH

Replacement Boilers
Post-Bid
Dayton, OH 45402

Project CSC-20082 Overhaul AFD on Existing Chillers, Building 23 at DSCC in Columbus, OH, FH 20
Results
Columbus, OH 43218

Boiler Improvement Project - 2022
Alteration
Bidding
$520,000 est. value
New Philadelphia, OH

Last Updated 01/31/2022 10:04 AM
Project Title

Mount Vernon High School Boiler Replacement

Physical Address View project details and contacts
City, State (County) Mount Vernon, OH 43050   (Knox County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $280,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace the existing boiler and circulating pump in the shop area with a new high efficiency, condensing, heating water boiler and circulation pump to match the existing. Replace the four (4) existing boilers in the main mechanical room with two (2) new high efficiency, condensing heating water boilers. Replace the existing music wing boiler located on the gymnasium mezzanine with a hew high efficiency, condensing heater water boiler. All new heating water boilers and pumps will be tied into the existing building automation system.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents