Similar Projects
Engineering Hall Sprinkler and Gas Piping-Phase 1 - GPC
Infrastructure, Alteration
Bidding
$3,500,000 est. value
Madison, WI 53706

Engineering Hall Sprinkler and Gas Piping-Phase 1 - MEP
Infrastructure, Alteration
Bidding
$3,500,000 est. value
Madison, WI 53706

Above Ground Fuel Tank Storage System
Infrastructure
Post-Bid
Lodi, WI 53555

Fort Mccoy Central Fuels Repair
Term Contract
Post-Bid
Fort McCoy, WI

Capitol Drive Airport Fuel System Upgrade
Results
Pewaukee, WI 53072

2020 Chemical Phosphorus Improvements
Results
Waterloo, WI 53594

XPO Logistics Tanks
Alteration
Bidding
Tomah, WI 54660

Fuel System Relocation and Upgrade
Alteration
Post-Bid
Appleton, WI

Fueling Facility Upgrades
Results
McFarland, WI 53558

Fuel System Upgrade
Alteration
Post-Bid
Oconomowoc, WI

Installation of Radon Gas Mitigation System
Results
Milwaukee, WI 53207

Fuel Tank Replacement and Infrastructure
Infrastructure
Post-Bid
Nashotah, Sussex, WI 53058

Fueling System Removal
Results
Less than $258,500 est. value
Wisconsin Rapids, WI

Hartford Municipal Airport
New Construction
Post-Bid
Madison, WI

Landfill Phase 4 Gas System
Results
$210,300 est. value
Janesville, WI

Last Updated 10/28/2021 09:24 AM
Project Title

Fueling System Improvements Maintenance/Central Stores Facility University of Wisconsin

Physical Address View project details and contacts
City, State (County) Eau Claire, WI 54701   (Eau Claire County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $90,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and replacement of gasoline dispenser, dispenser island, underground storage tank (UST) fuel pump, fuel and vent piping, and miscellaneous appurtenances. During fuel piping replacement, a tank system site assessment (TSSA) will be conducted by the A/E. Demolition activities include the demolishing and removal of concrete slabs, fueling island, spill pad, tank controller and switches. The final demolition limits will be restored by bituminous asphalt pavement or reinforced concrete.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation, Demolition.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents