Similar Projects
Indian Tree Golf Club Improvements
New Construction, Renovation, Addition
Design
Westminster, CO 80005

Climbing Access Trail Construction
Post-Bid
CO

Elk Meadow Park Stagecoach Trailhead Improvements
Infrastructure
Post-Bid
Evergreen, CO 80439

2021 Concrete Rehab-Ada Improvements
Results
$200,000 to $250,000 est. value
Wheat Ridge, CO

Sidewalk Elevation Differential Mitigation (Sawing)
Results
Lakewood, CO

Green Gables Elementary School Site Path
Infrastructure
Post-Bid
$75,000 est. value
Lakewood, CO 80227

Parking Lot Expansion
Results
Less than $45,000 est. value
Lakewood, CO 80227

Replace the Signal Equipment and Update Curb Ramps and Pedestrian Islands at 3 Intersections
Infrastructure
Post-Bid
$1,000,000 to $5,000,000 est. value

Sidewalk Improvements On Independence Street - 6th Avenue to Lakewood High School
Alteration
Results
Less than $348,004 est. value
Lakewood, CO 80215

Concrete Replacement at Simms Street Recreation Center and Secrest Center
Term Contract
Post-Bid
Arvada, CO 80005

Coyote Gulch Park Sidewalk Replacement
Infrastructure
Results
$100,000 to $150,000 est. value
Lakewood, CO 80228

2022 ADA Ramps and Concrete Replacement Program
Infrastructure
Post-Bid
Arvada, CO

Standley Lake High School Renovation and Addition
Renovation, Addition
Results
$5,000,000 to $6,000,000 est. value
Westminster, CO 80021

Alameda Shared Use Path Kipling to Garrison
Infrastructure
Post-Bid
$300,000 est. value
Lakewood, CO

Downtown Westminster Maintenance
Infrastructure
Results
Westminster, CO 80031

Last Updated 05/26/2022 06:27 PM
Project Title

Parking Lot Asphalt Repairs

Physical Address View project details and contacts
City, State (County) CO   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Asphalt repairs in parking lots including; mill and resurface, patching and IR patching, remove and replace asphalt work at three of Apex Park and Recreation District’s facilities.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents