Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Latino Cultural Center - AR00000005 - City of Phoenix
New Construction, Renovation, Infrastructure
Conception
$902,484 CJ est. value
Phoenix, AZ 85004

Central and Thomas High Rise
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Phoenix, AZ 85012

Banner Gilbert Medical Center Parking Lots
Design
Gilbert, AZ 85234

RFQ D/B - F-35A Squadron Operations Facility #6
Demolition, New Construction, Infrastructure
Bidding
$25,000,000 CJ est. value
Glendale, AZ 85309

RFQ D/B - F-35A Squadron Operations Facility #6
Demolition, New Construction, Infrastructure
Bidding
$25,000,000 CJ est. value
Glendale, AZ 85309

RFQ Construction Manager at Risk - Site 20 New Reservoir Construction
Infrastructure
Post-Bid
$13,700,000 CJ est. value
Gilbert, AZ 85297

Research on the Impact of Diamond Grind Pavement Resurfacing on PM-10 Emissions
Term Contract
Post-Bid
AZ

Pinnacle Peak Road 45th Avenue to 35th Avenue Paving and Storm Drain Improvements
Results
$9,000,722 est. value
Glendale, AZ 85310

Lehi Crossing Shared Use Pathway - Phase 1
Results
Mesa, AZ

5290 East Exeter Subdivision
New Construction
Construction
Phoenix, AZ 85018

Bungalows on Westgate - Glendale
New Construction, Infrastructure
Construction
Glendale, AZ 85305

Laveen Spectrum
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Phoenix, AZ 85041

Greenbelt 88 - Lucky Plaza
New Construction, Infrastructure - 22,000 SF
Pending Verification
$115,000,000 CJ est. value
Scottsdale, AZ 85251

RFP - Development of P83 Central Business District
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Peoria, AZ 85345

Last Updated 08/11/2022 12:03 PM
Project Title

8th Street Multi-Use Path (Creamery Branch Rail Path) - 6007139 - City of Tempe

Physical Address View project details and contacts
City, State (County) Tempe, AZ 85281   (Maricopa County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $2,034,624 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is the construction of a pathway along the Creamery Branch Rail Spur and streetscape improvements along 8th Street. The project path would include landscaping and lighting along the non-operational rail track next to 8th Street (between Rural Road and McClintock Drive) adjacent to ASU and near downtown Tempe. The streetscape improvements are adjacent to and integrated in with the rail path and would include street trees, enhanced sidewalks and improved bicycle lanes. This project will include ADA Transition Plan identified repairs within the construction project limits. The project will better integration with historic structures while encouraging appropriate redevelopment on vacant lots or deteriorating structures. Old 8th Street spans a significant prehistoric archaeological site and was the location of the Bankhead Highway. In addition, the Borden Creamery Complex (Four Peaks), the Elias-Rodriguez House, Marlatt's Garage, and the Kirkland-McKinney Ditch are all located along 8th Street. As of August 11, 2022, this project is currently in the City of Tempe's FY 2022-2027 CIP. Information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents