Similar Projects
2020 Local Road Project - Arthur Township - 4,450 Tons of 22A Mod. or 12A MDOT Gravel - Ashard Road
Post-Bid
Harrison, MI

Arthur Township - 4,500 Tons of 22A Mod. or 23A MDOT Gravel - Athey Avenue
Post-Bid
Harrison, MI

Asphalt Project
Results
Clare, MI

0.28 MI of Hot Mix Asphalt Reconstruction, Aggregate Base, Drainage and Pavement Markings
Results
Mount Pleasant, MI 48804

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

21.33 MI of Single Course Chip Seal and Fog Seal on Various Routes, Clare County
Results
MI

Central Division - Asphalt Paving Maintenance
Post-Bid

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Paving & Site Lighting
Post-Bid

27.48 MI of Single Course Chip Seal, Fog Seal and Pavement Markings on Various Routes
Results
Shepherd, MI 48883

Lakewood Wastewater Authority - Phase II Collection Improvements - Gravity Interceptor Sewer And Force Main
Post-Bid
Lake, MI

0.16 MI of Hot Mix Asphalt Surface Removal and Resurface, Concrete Curb, Gutter and Sidewalk And Pavement Markings on Wright Avenue from Fourth Street to Chippewa Street
Results
Shepherd, MI 48883

Ogemaw Dr., Otto Dr., & Ojibway Dr., Improvements
Post-Bid
Mount Pleasant, MI

0.27 MI of Hot Mix Asphalt Cold Milling and Resurfacing, Concrete Curb, Gutter, Sidewalk and Ramps, Drainage, Watermain, Signing and Pavement Markings and Traffic Signal Installation Including Control
Results
MI

Arthur Township 22A MOD or MDOT 22A Gravel
Post-Bid
Harrison, MI

Last Updated 08/18/2021 08:18 AM
Project Title

MDOT on US-127 in Grant and Vernon Townships

Physical Address View project details and contacts
City, State (County) (Clare, Isabella Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Maintenance work shall consist 1.5” uniform depth Cold Milling the HMA surface and a 1.5” HMA 5E10 overlay of the travel lanes, both shoulders, and a maintenance crossover on NB and SB of US-127. Work also includes the placement of shoulder gravel and permanent pavement markings including shoulder corrugations. Throughout the project, traffic will be maintained as described in the Maintaining Traffic section of the log contained in this proposal

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents