Similar Projects
Eglin AFB - Replace Fire Alarm and Fire Suppression Building 1206
Design
$1,000,000 to $5,000,000 est. value
Eglin AFB, FL 32542

Fire Protection, Emergency Management & Emergency Medical Services (FEMS) IV
Term Contract
Bidding
Canaveral As, FL

Fire Suppression Systems - Testing, Inspection, and Maintenance
Alteration
Bidding
Orlando, FL 32805

FAMU Bragg Stadium Renovations Phase 2
Alteration
Sub-Bidding
Tallahassee, FL 32310

Patrick AFB Fire Extinguisher Services
Post-Bid
Patrick AFB, FL 32925

Fire Suppression System
Post-Bid
$100,000 to $199,999 est. value
Orlando, FL 32801

MIA - Terminal H FL2 Area A - Smoke Evacuation System
Results
$832,796 est. value
Miami, FL

Removal and Replacement of Fire Alarm Devices
Results
Land O Lakes, FL 34637

Civic Center Phase II Improvements: Fire Alarm Upgrades And West Section Hvac Improvements
Alteration
Bidding
$1,000,000 est. value
Sunrise, FL 33351

Northeast Florida State Hospital Fire Alarm Fiber Replacement
Post-Bid
Macclenny, FL

Fire Protection Equipment Inspections and Maintenance
Term Contract
Results
$25,485 est. value
Fort Pierce, FL 34950

Fire Suppression System Services
Term Contract
Bidding
Pensacola, FL

MIA Fire Alarm Replacement
Post-Bid
Miami, FL

Jacksonville - Fire Suppression System Upgrades
Results
$3,500,000 to $3,600,000 est. value
Jacksonville, FL 32209

Orange County Convention Center Campus Dry Sprinkler Pipe Replacement
Alteration
Bidding
Orlando, FL 32819

Reported 04/21/2022 12:00 AM
Project Title

Fire Main Sprinkler System Repairs

Physical Address View project details and contacts
City, State (County) Bradenton, Cortez, FL 34215   (Manatee County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The completion of the Fire Main repairs of the sprinkler system requirements are listed in the SOW. All additional costs associated with the repairs not included in the original quote shall be provided in writing prior to the start of the work for approval. Upon acceptance the Contractor shall commence work as per scheduled, the facility shall remain in operation throughout the service. The requirements in accordance with the Scope of Work (SOW), the contractor shall provide all labor, materials, and equipment to perform the Fire main Repairs. The contractor shall furnish trained, qualified personnel and any required special tools. Contractor shall protect all equipment in work locations.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents