Similar Projects
Street Refurbishment Project
Infrastructure
Bidding
$200,000 est. value
Noxapater, MS

2022 Drive Martin Luther King, Jr Drive Improvement Project
Infrastructure
Bidding
$250,000 est. value
Shelby, MS 38774

Annual Full Depth Reclamation
Post-Bid
Southaven, MS

2021 Overlay Petal
Post-Bid
Petal, MS

Mill and Overlay
Results

Mill and Overlay
Results

Construction of the 2022 Roadway Improvements
Infrastructure
Bidding
$200,000 est. value
Morton, MS

Hardy Street Roundabout Project at 2nd Avenue/Green Street/Adeline Street
Post-Bid
$1,400,000 to $1,500,000 est. value
Hattiesburg, MS 39407

Mill and Overlay
Results
MS

County Wide Reseal 2022
Infrastructure
Bidding
$3,000,000 est. value
MS

Bay St. Louis Citywide Paving Project Phase 4 Asphalt Roads
Post-Bid
Bay Saint Louis, MS

Overlay Approximately 6.5 Miles on US 61 from the Warren County Line to the Sharkey County Line
Results
MS

Biloxi Main Street CSX Railroad Crossing Improvement Project
Infrastructure
Bidding
$600,000 to $800,000 est. value
Biloxi, MS 39530

Douglas Circle and King Drive Street Improvements
Infrastructure
Post-Bid
Vardaman, MS

Hot Mix Asphalt Overlay on Various Roads
Results
$3,145,212 est. value
Hernando, MS

Reported 06/22/2022 12:00 AM
Project Title

Street Overlay Project

Physical Address View project details and contacts
City, State (County) Batesville, MS   (Panola County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes: The work to be performed under this contract shall consist of furnishing all labor, tools, equipment and materials and performing all work necessary for the complete construction of all the street rehabilitation shown in the construction documents. The major items of work shall consist of, but not be limited to all necessary repairs and/ or milling, and asphalt overlay called for in the plan portion of the contract documents. Contract time is 60 consecutive calendar days.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents