Similar Projects
Air-Cooled Chiller Replacement - Center for Innovation and Entrepreneurship
Renovation
Sub-Bidding
$885,000 CJ est. value
N Dartmouth, MA 02747

Window and HVAC Replacement
Renovation
Sub-Bidding
$200,000 CJ est. value
New Bedford, MA 02740

Designer and Construction Administration Services for Twenty Furnace Replacements
Alteration
Post-Bid
$110,000 est. value
New Bedford, MA

HVAC Maintenance & Repairs
Term Contract
Post-Bid
Hyannis, New Bedford, MA - Middletown, Providence, RI 02908

HVAC Upgrades of Floriculture Building - Filed Sub-Bids Due
Alteration
Results
$150,000 est. value
Dighton, MA 02715

HVAC Upgrades of Floriculture Building - General Bids Due
Alteration
Results
$150,000 est. value
Dighton, MA 02715

Mini-Split Heat/Ac Unit
Alteration
Post-Bid
Dighton, MA 02715

New PFAS Facility, Cate Springs Well - Sub Bid
Alteration
Results
$450,000 est. value
Mansfield, MA

Installation of One Trane 97% VS 2 Speed Multi-Positioned Gas Furnace
Alteration
Post-Bid
Dighton, MA 02715

Toilets, Heat Replacement, Bath Fans and Siding
Alteration
Results
$1,040,000 est. value
New Bedford, MA

Annual HVAC Preventative Maintenance and Repair Services
Term Contract
Post-Bid
$10,000 est. value
North Attleboro, MA

Toilets, Heat Replacement, Bath Fans and Siding
Alteration
Results
$1,040,000 est. value
New Bedford, MA

Weatherization
Term Contract
Post-Bid

Carney and Hayden-McFadden Schools Cooler Replacement - Sub-Bids
Alteration
Results
$280,000 est. value
New Bedford, MA 02740

J041--Heating, Ventilation, Air Conditioning and Refrigeration (HVAC/R) Maintenance, Repair and Installation
Term Contract
Post-Bid

Last Updated 05/23/2023 05:12 PM
Project Title

FY23/FY24 HVAC Replace and Repair

Physical Address View project details and contacts
City, State (County) Taunton, MA 02780   (Bristol County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,270,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

HVAC Replacement And Repair For The Following Schools: Edward F. Leddy Preschool Edmund H. Bennett Elementary School Joseph H. Martin Middle School The starting time to be announced in the official posting notice. The School Committee reserves the right to reject any/all proposals or any part of any proposal, as deemed in the best interest of the City of Taunton, Massachusetts. Any and all questions relative to these specifications must be submitted in writing to the Awarding Authority at least seven (7) days before March 15, 2023, and written answers shall be sent to all bidders as an addendum. Edward F. Leddy Preschool 36 2nd Street Taunton, MA 02780 This school has been identified as requiring an upgrade to the HVAC system. o Replacement of unit ventilators that include a steam heating coil and direct expansion (DX) cooling coils o Purchase and installation of a new heat pump system connected to these unit ventilators. o Purchase, and installation of a new packaged rooftop unit to provide heating and ventilation to the Cafetorium, this unit should be energy efficient and ensure improved filtration. o Contractor is responsible for maintaining a safe work environment. o Contractor is responsible for all necessary supplies and equipment to remove and replace equipment as well as delivery and disposal of all materials. o Contractor is required to put units online and ensure they are fully functional o Contractor is responsible for all roofing, electric connections, and plumbing. If electrical upgrades are required to ensure the system functioning properly please include this in the bid. o Contractor must furnish staging, rigging, cranes (if necessary), temporary supports, labor, and the materials to perform all operations in connection with the installation of the HVAC work. o Contractor is responsible for the removal and disposal of all old HVAC equipment and any debris from the work site. This building was constructed in 1947, if the contractor encounters any asbestos-containing materials (ACM), have a plan in place to dispose of them properly. It is unknown if the building contains any ACM. It is understood that this is unknown and a change order may need to occur. The change order must be reasonable and in line with industry costs. Edmund Hatch Bennett Elementary School 47 North Walker Street Taunton, MA 02780 o Replacement of the heating and ventilation units for both the cafeteria and the gymnasium o Replacement units will be required to be energy efficient and improve the current filtration o Contractor is responsible for maintaining a safe work environment. o Contractor is responsible for all necessary supplies and equipment to remove and replace equipment as well as delivery and disposal of all materials. o Contractor is required to put units online and ensure they are fully functional o Contractor is responsible for all roofing, electric connections, and plumbing. If electrical upgrades are required to ensure the system functioning properly please include this in the bid. o Contractor must furnish staging, rigging, cranes (if necessary), temporary supports, labor, and materials to perform all operations in connection with the installation of the HVAC work. o Contractor is responsible for the removal and disposal of all old HVAC equipment and any debris from the work site Joseph H. Martin Middle School 131 Caswell Street East Taunton, MA 02718 o Replacement of the heating and ventilation unit in the gymnasium o Replacement unit will be required to be energy efficient and improve the current filtration o Contractor is responsible for maintaining a safe work environment. o Contractor is responsible for all necessary supplies and equipment to remove and replace equipment as well as delivery and disposal of all materials. o Contractor is required to put units online and ensure they are fully functional o Contractor is responsible for all roofing, electric connections, and plumbing. If electrical upgrades are required to ensure the system functioning properly please include this in the bid. o Contractor must furnish staging, rigging, cranes (if necessary), temporary supports, labor, and materials to perform all operations in connection with the installation of the HVAC work. o Contractor is responsible for removing and disposing all old HVAC equipment and any debris from the work site. Question Deadline 03/29/2023 Bidders requiring clarification or interpretation of the Contract Documents shall make a written request to the Awarding Authority through: Brenda Moynihan, Assistant Superintendent for Finance & Operations 215 Harris Street Taunton, MA 02780 bmoynihan@tauntonschools.org Phone: 508-821-1235 Fax: 508-821-1177

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents