Similar Projects
HVAC System Upgrade Phase 2
Renovation
Sub-Bidding
$5,000,000 CJ est. value
Cheyenne, WY 82001

Moyer Building Medium Density Fibreboard (MDF) Cooling Replacement
Renovation
Sub-Bidding
$200,000 CJ est. value
Powell, WY 82435

H941--Airflow Test and Balance (Tab) and HVAC Controller Services
Term Contract
Post-Bid
Loveland, CO - Cheyenne, WY 82001

Replace the Pneumatic HVAC controls
Alteration
Post-Bid
Cody, WY 82414

Story Elementary HVAC Upgrade
Alteration
Results
$100,000 est. value
Story, WY 82832

Purchase and Installation of Boiler for County Courthouse Snowmelt System
Renovation
Results
$117,343 CJ est. value
Laramie, WY 82070

Burns High School Gymnasium Ventilation LCSD #2
Renovation, Infrastructure
Sub-Bidding
$100,000 CJ est. value
Burns, WY 82053

Cooling Upgrades
Term Contract
Post-Bid
Casper, WY 82601

Rocky Mountain High School Ventilation Improvement
Renovation
Results
$419,914 CJ est. value
Cowley, WY 82420

Burns High School A/C project
Renovation
Sub-Bidding
Burns, WY 82053

UW Cheyenne Family Medicine Clinic - Temperature Controls Upgrades
Alteration
Post-Bid
Laramie, WY 82071

Sheridan College Whitney Center for the Arts IT Core ACU-2 Replacement
Renovation
Results
$245,735 CJ est. value
Sheridan, WY 82801

Exhaust Fans for Agriculture Building
Alteration
Post-Bid
Laramie, WY 82071

Waste Water Collections Building HVAC Upgrades
Renovation
Results
$103,000 CJ est. value
Casper, WY 82609

As Needed HVAC Testing and Balance Services at the Thyra Thompson Building
Alteration
Post-Bid
Casper, WY 82601

Last Updated 05/03/2023 09:34 AM
Project Title

Chiller Removal and Replacement

Physical Address View project details and contacts
City, State (County) Cheyenne, WY 82009   (Laramie County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $80,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition - The work includes disconnecting all controls and electrical power connections, removal and recycling of existing R22 refrigerant, draining and capture of existing propylene glycol/water mixture, disconnection of chilled water piping from the chiller, and removal of the existing chiller and all scrap materials for proper disposal and recycling The existing equipment pad will be assessed to determine if it is structurally sound and of correct size and strength to properly install and level the replacement chiller. Any deficiencies will be corrected under the terms of this contract before the new chiller is placed. Each proposal MUST BE ACCOMPANIED BY A PROPOSAL GUARANTY IN THE AMOUNT OF 10% OF THE TOTAL BID The Agency reserves the right to reject any or all bids, to waive any informalities or technical defects in bids, and unless otherwise specified by the Agency or by the Contractor, to accept any item or group of items in the bid, as may be in the best interest of the Agency

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents